NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
DAMAGE DETECTION ON ALUMINUM PLATE USING FIBER OPTIC SENSORS FOR STRUCTURAL HEALTH MONITORING. |
Member |
01-SEP-2021 |
31-AUG-2023 |
Sedang Berjalan |
2. |
DEVELOPMENT OF FIBRE BRAGG GRATING GAP SENSOR FOR REAL TIME MONITORING OF BOLTED FLANGE CONNECTION |
Member |
15-JUL-2021 |
14-JUL-2023 |
Sedang Berjalan |
3. |
INVESTIGATION OF BOLT WITH EMBEDDED FIBER BRAGG GRATING SENSOR FOR MONITORING OF IN-SERVICE BOLTED JOINTS IN OIL AND GAS PLANT |
Member |
15-DEC-2019 |
14-MAR-2022 |
Selesai (Mencapai Semua KPI) |
4. |
PREDICTION OF FATIGUE CRACK INITIATION IN COMPOSITE USING FIBRE BRAGG GRATING SENSOR |
Leader |
05-AUG-2019 |
04-NOV-2021 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
5. |
DYNAMIC CHARACTERISTIC INVESTIGATION OF MULTI-AXIAL FIBER BRAGG GRATING ACCELEROMETER FOR AUTOMOTIVE APPLICATION |
Member |
25-APR-2018 |
24-JUL-2020 |
Selesai (Mencapai Semua KPI) |
6. |
Development Of A New Technique To Increase The Sensitivity In Crack Identification For Automotive Component : Vibrations Based Analysis |
Member |
01-JUN-2012 |
31-MAY-2014 |
Tamat (Perlu hantar laporan akhir) |
7. |
DESIGN AND DEVELOPMENT OF PLUG IN ELECTRIC VEHICLE FOR PROTON GREEN MOBILITY CHALLENGE (PGMC) 2012: THE UMP-EV TEAM |
Member |
20-JAN-2012 |
30-SEP-2012 |
Tamat (Perlu hantar laporan akhir) |
8. |
Development of Real Time Monitoring Welding Defect Detection System |
Leader |
15-DEC-2011 |
15-JUN-2014 |
Selesai (Tutup Projek) |
9. |
A Frequency Domain Approach for Fatigue Life Estimation of An Automotive Suspension System |
Member |
15-AUG-2011 |
15-FEB-2013 |
Selesai (Tutup Projek) |
10. |
A Novel Technique Using the Acoustic Emission Features in Bone Tissues |
Leader |
15-MAY-2011 |
15-DEC-2012 |
Selesai (Tutup Projek) |
11. |
Quantitative Assessment Exposure of Vibration to Malaysian Drivers |
Member |
01-AUG-2010 |
30-SEP-2012 |
Selesai (Mencapai Semua KPI) |
12. |
Development of Online Machining Condition System: An Acoustic Emision Approached |
Member |
01-MAY-2010 |
30-NOV-2011 |
Tamat (Perlu hantar laporan akhir) |