NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
PERFORMANCE EVALUATION ON U-NEEDLE CUCR FOR CORE RACKING SYSTEM IN
VAC (M) SDN. BHD. |
Member |
01-JAN-2024 |
31-DEC-2025 |
Sedang Berjalan |
2. |
APPROXIMATION OF FEMUR AND TIBIA MEASUREMENT USING ARTIFICIAL NEURAL NETWORK METHOD FOR MALAYSIAN ADULT |
Leader |
15-SEP-2023 |
14-SEP-2025 |
Sedang Berjalan |
3. |
SYNTHESIS AND CHARACTERIZATION OF HYDROXYAPATITE/MAGNESIUM COATING PERFORMANCES ON CO-CR-MO ALLOY FOR IMPLANT SCREW APPLICATION |
Member |
01-JUL-2023 |
30-JUN-2025 |
Sedang Berjalan |
4. |
Performance Evaluation and Optimization of Manufacturing Process |
Member |
01-NOV-2019 |
31-OCT-2021 |
Selesai (Mencapai Semua KPI) |
5. |
INVESTIGATION OF TAA IMPLANT LIFE CYCLE USING FINITE ELEMENT METHOD |
Member |
01-APR-2019 |
30-JUN-2021 |
Selesai (Mencapai Semua KPI) |
6. |
INTERACTION MECHANISM OF MODIFIED GRAPHENE TO ENHANCE PROPERTIES OF EPOXY NANOCOMPOSITES. |
Member |
01-APR-2019 |
30-JUN-2021 |
Selesai (Mencapai Semua KPI) |
7. |
Bioactivity performances of PLA/hydroxypatite on Co-Cr-Mo alloy by dip coating method for biomedical application |
Member |
01-JAN-2019 |
30-SEP-2021 |
Selesai (Mencapai Semua KPI) |
8. |
Investigation on pullout strength between different design of cannulated pedicle screw and osteoporosis bones to obtain an optimum design |
Leader |
01-JAN-2019 |
30-SEP-2021 |
Selesai (Tidak Mencapai KPI) |
9. |
PARAMETER OPTIMIZATION OF CANNULATED PEDICLE SCREW AND OSTEOPOROSIS BONES FIXATION THROUGH FINITE ELEMENT METHOD |
Leader |
30-APR-2018 |
29-JUL-2020 |
Selesai (Mencapai Semua KPI) |
10. |
Effects of biodegradable PLA on hydroxyapatite coating to improve adhesion properties on Co-Cr-Mo alloy |
Member |
05-OCT-2017 |
04-OCT-2019 |
Selesai (Mencapai Semua KPI) |
11. |
Development of a Lightweight Front Lower Control Arm using Polyetheretherketone(PEEK) |
Leader |
20-SEP-2017 |
19-SEP-2019 |
Selesai (Mencapai Semua KPI) |
12. |
BEE-QX: MOULDED PLASTIC TYPE QUEEN EXCLUDER FOR BEE HIVES |
Member |
15-JAN-2017 |
14-JAN-2018 |
Tamat (Perlu hantar laporan akhir) |
13. |
Investigation on Initial Peak Force and Energy Absorption of High Strength Steel Crash Box Having Notch as Initial Trigger Mechanism |
Member |
01-AUG-2016 |
31-JUL-2019 |
Selesai (Tidak Mencapai KPI) |
14. |
Surface Integrity of Al-Si/AlN MMC in End Milling Machining Process under Dry Cutting Condition |
Member |
25-JUN-2016 |
24-JUN-2018 |
Tamat (Tutup Projek) |
15. |
Hydroxyapatite Coating with Oxide Interlayer on Biomedical Grade Cobalt Based Alloy |
Member |
01-NOV-2014 |
31-OCT-2016 |
Tamat (Tutup Projek) |
16. |
New Approach of Ankle Morphometric Measurements for Total Ankle Arthroplasty (TAR) Design |
Leader |
25-OCT-2014 |
24-OCT-2016 |
Tamat (Tutup Projek) |
17. |
Design and Develop Blow Mould Using Machining Optimization Parameters |
Member |
01-AUG-2009 |
31-JUL-2010 |
Tamat (Tutup Projek) |
18. |
Design and Development of a Lift System for Diasable People |
Member |
01-MAY-2009 |
31-OCT-2010 |
Tamat (Perlu hantar laporan akhir) |
19. |
Statistical and artificial intelligent study to determine the effect of milling parameters on cutting force, stress and surface roughness when milling Aluminium and Nickel Superalloy |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
20. |
Development of Prototype Automated Guided Vehicle For Dispatching Application |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
21. |
Development of Laser Cutting and Engraving Machine Utilising PC-NC Controller |
Member |
04-JAN-2007 |
30-MAR-2008 |
Selesai (Mencapai Semua KPI) |
22. |
Design of Casting Process Control System for Automatic Flat Sheet Membrane Casting Machine. |
Member |
01-NOV-2005 |
31-OCT-2006 |
Diberhentikan/Ditamatkan |