NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
EXPLORING THE RELATIONSHIP BETWEEN PSYCHOSOCIAL RISK FACTORS AND THE MUSCULOSKELETAL DISORDER SYMPTOMS AMONG LOCAL COOKS |
Member |
25-DEC-2022 |
24-DEC-2024 |
Sedang Berjalan |
2. |
OPTIMISATION OF PI-PD CONTROLLER FOR DC MOTOR POSITION OF THE LINEAR CONVEYOR SYSTEM USING MODIFIED ADAPTIVE BATS SONAR ALGORITHM. |
Member |
01-OCT-2021 |
30-SEP-2023 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
3. |
FORECAST CAPACITY MEASUREMENT MODEL IN ACADEMIC ORGANISATION |
Member |
01-SEP-2021 |
31-AUG-2023 |
Selesai (Mencapai Sebahagian KPI) |
4. |
COSTING IMPROVEMENT USING TIME-DRIVEN ACTIVITY BASED COSTING AT ACADEMIC LIBRARY |
Member |
15-NOV-2019 |
14-FEB-2022 |
Selesai (Mencapai Semua KPI) |
5. |
INTEGRATION OF CORE CLASSIFICATION AND COST REDUCTION OPPORTUNITY FOR AUTOMOTIVE RE-MANUFACTURING DECISION |
Member |
30-APR-2018 |
24-JUL-2020 |
Selesai (Mencapai Semua KPI) |
6. |
Laser thickness measuring system for thin strip alloy |
Leader |
25-MAY-2017 |
24-MAY-2019 |
Selesai (Tidak Mencapai KPI) |
7. |
A New Forecasting Algorithms for Performance Measurement In Manufacturing Industries |
Member |
01-AUG-2016 |
31-JUL-2019 |
Selesai (Tidak Mencapai KPI) |
8. |
Systematic Sustainability Assessment (SSA) for the Conceptual Design Phase in Malaysia Automotive Industry |
Member |
05-APR-2016 |
04-APR-2018 |
Tamat (Perlu hantar laporan akhir) |
9. |
Systematic Sustainability Assessment (SSA) Framework Of Automotive-Related Industry In The Malaysia Context |
Member |
01-DEC-2015 |
30-NOV-2017 |
Tamat (Tutup Projek) |
10. |
Performance Of Assessment Model For In Situ Design Concept Evaluation Using Integrated Rough-Grey Analysis |
Member |
02-NOV-2015 |
01-NOV-2018 |
Selesai (Mencapai Semua KPI) |
11. |
Criteria Selection Method in Design Evaluation for Product Development using Integrated Fuzzy-AHP |
Member |
15-NOV-2014 |
14-NOV-2016 |
Tamat (Tutup Projek) |
12. |
Simulation and Evaluation of Assembly Line Balancing in Perodua Manufacturing Plant |
Leader |
15-AUG-2014 |
14-AUG-2016 |
Tamat (Tutup Projek) |
13. |
An Improved Decision Support Tool for Dynamics Job Shop Scheduling |
Member |
15-MAY-2014 |
14-MAY-2016 |
Tamat (Tutup Projek) |
14. |
Development of Decision Model for Implementing Lean Manufacturing Methods using Topsis and AHP in Fuzzy Environment |
Member |
01-DEC-2013 |
30-NOV-2015 |
Tamat (Perlu hantar laporan akhir) |
15. |
Single Minute Exchange Die(SMED) Model For Set-up Time Reduction In Automotive Sector Manufacturing Process |
Member |
01-DEC-2013 |
30-NOV-2015 |
Selesai (Tidak Mencapai KPI) |
16. |
Statistical Process Control: Fuzzy Control Chart and Process Capability Indices with Normal Data in the Supply Chain of Automotive Industry |
Member |
01-DEC-2013 |
30-NOV-2014 |
Tamat (Perlu hantar laporan akhir) |
17. |
An Investigation Into Proactive Ergonomics Measures Barriers at Early Product Development Phases in Malaysian Automotive Industries |
Leader |
25-JUN-2013 |
24-DEC-2015 |
Tamat (Tutup Projek) |
18. |
Fabrication and Properties of Functionally Graded Materials (FGMs) |
Member |
25-JUN-2013 |
24-JUN-2015 |
Tamat (Tutup Projek) |
19. |
Multi-Mode Failures Modelings in Reliability Engineering Systems with Bayesian Analysis Approach |
Member |
14-JUN-2013 |
14-DEC-2015 |
Tamat (Perlu hantar laporan akhir) |
20. |
Multi-Objective Genetic Algorithm for Flowshop Scheduling Problem |
Leader |
01-OCT-2012 |
30-SEP-2014 |
Tamat (Tutup Projek) |
21. |
The Impact of Lean Kitting Supply System on Reducing Non Value Added Activates in the Motorcycle Engine Assembly Process |
Member |
01-OCT-2012 |
30-SEP-2014 |
Tamat (Tutup Projek) |
22. |
Multi-Objective Genetic Algorithm for Flowshop Scheduling Problem |
Leader |
01-OCT-2012 |
30-SEP-2014 |
Tamat (Tutup Projek) |
23. |
Development of Laser Cutting and Engraving Machine Utilising PC-NC Controller |
Member |
04-JAN-2007 |
30-MAR-2008 |
Selesai (Mencapai Semua KPI) |