ACADEMIC STAFF
+  Fakulti Teknologi Kejuruteraan Kimia Dan Proses (103)
+  Fakulti Teknologi Kejuruteraan Awam (81)
+  Fakulti Teknologi Kejuruteraan Elektrik Dan Elektronik (94)
+  Fakulti Komputeran (80)
+  Fakulti Teknologi Kejuruteraan Mekanikal Dan Automotif (89)
+  Fakulti Sains Dan Teknologi Industri (75)
+  Fakulti Teknologi Kejuruteraan Pembuatan Dan Mekatronik (64)
+  Fakulti Pengurusan Industri (48)
+  Pusat Bahasa Moden (59)
 

Search by Name Expertise

Home> FKM1000-FAKULTI TEKNOLOGI KEJURUTERAAN MEKANIKAL DAN AUTOMOTIF

TS. DR. AHMAD NASSER BIN MOHD ROSE

Contact No. : 094246348
Gender : MALE
Nationality : MALAYSIA
Current Positon : DS52-A-PENSYARAH UNIVERSITI
E-Mail : nasser@ump.edu.my
 
ACADEMIC QUALIFICATION
. 2015 : IJAZAH KEDOKTORAN (DOCTORAL DEGREE), UNIVERSITI KEBANGSAAN MALAYSIA, KUALA LUMPUR
. 1996 : IJAZAH SARJANA (MASTERS DEGREE), University of Warwick
. 1995 : IJAZAH SARJANA MUDA (BACHELOR DEGREE), University of Sunderland
 
EXPERTISE
EXPERT AREA MAJOR YEARS OF EXPERTISE LEVEL
LEAN OPERATIONS LEAN TOOLS AND TECHNIQUES
8
SANGAT TINGGI
MANAGEMENT AND PRODUCTIVITY INDUSTRIAL ENGINEERING
10
TINGGI
QUALITY MANAGEMENT (INCLUDING TOTAL QUALITY MANAGEMENT (TQM)) ISO9000, QUALITY TOOLS
8
TINGGI
QUALITY MANAGEMENT : ISO 9000:2000 PRODUCTION CONTROL SYSTEM : LEAN MANUFACTURING -
0
-
 
EMPLOYMENT HISTORY
EMPLOYER POST JOIN DATE RESIGN DATE STATUS
Hitachi Consumer Product(M)Sdn.Bhd. Supervisor 15/12/1989 31/08/1993 Tetap
Terengganu Advanced Technical Institute(Tati) Senior Lecturer 15/02/1997 14/11/2006 TETAP
   
RESEARCH
NO. TITLE ROLE START DATE END DATE STATUS
1. EXPLORING THE RELATIONSHIP BETWEEN PSYCHOSOCIAL RISK FACTORS AND THE MUSCULOSKELETAL DISORDER SYMPTOMS AMONG LOCAL COOKS Member 25-DEC-2022 24-DEC-2024 Sedang Berjalan
2. MODELING AND OPTIMIZATION OF COST-BASED HYBRID FLOWSHOP SCHEDULING IN AUTOMOTIVE COMPONENT PRODUCTION Member 15-NOV-2022 14-NOV-2024 Sedang Berjalan
3. MULTI-STAGE FLOW SHOPS SCHEDULING WITH ENERGY UTILIZATION USING METAHEURISTIC OPTIMIZATION FOR AUTOMOTIVE COMPONENT PLANT Member 01-APR-2021 31-MAR-2023 Tamat (Perlu hantar laporan akhir)
4. ERGONOMICS AUTOMOTIVE WELDING WORKSTATION SET-UP MODELLING FOR MUSCULOSKELETAL DISORDERS (MSD) ISSUES Member 01-SEP-2019 31-MAY-2022 Selesai (Tidak Mencapai KPI)
5. Formulation of A Combinatorial Permutation-Based Metaheuristic Algorithm to Optimize Energy Utilization in Assembly Line Member 01-SEP-2019 31-MAY-2022 Selesai (Tidak Mencapai KPI)
6. ENERGY UTILIZATION MODELLING AND OPTIMIZATION FOR MACHINE SCHEDULING PROBLEM IN PRODUCTION Member 01-APR-2019 30-JUN-2021 Selesai (Mencapai Semua KPI)
7. Enhancement Small Medium Enterprise (SMEs)Performance through Integrating lean manufacturing (LM) and industrial revolution 4.0 (IR 4.0) - Automotive component industry Leader 01-JAN-2019 30-SEP-2021 Selesai (Tidak Mencapai KPI)
8. FRAMEWORK DEVELOPMENT FOR SPECIAL PURPOSE VEHICLE (SPV) ASSEMBLY LINE OPTIMISATION UTILISING WITNESS SIMULATION AND ERGONOMIC ANALYSIS Member 25-SEP-2018 24-DEC-2020 Tamat (Laporan akhir dikembalikan dan perlu dihantar semula)
9. A New Forecasting Algorithms for Performance Measurement In Manufacturing Industries Member 01-AUG-2016 31-JUL-2019 Selesai (Tidak Mencapai KPI)
10. Development of knowledge based ergonomics assessment system at workplace in automotive assembly plan Member 25-JUN-2016 24-JUN-2018 Selesai (Mencapai Semua KPI)
11. ERGONOMICS STUDY ON MUSCULOSKELETAL DISORDERS (MSD) RELATED PROBLEMS AMONG WORKERS IN ELECTRONICS ASSEMBLY LINE� Member 25-JUN-2016 24-JUN-2018 Selesai (Mencapai Sebahagian KPI)
12. Normative anthropometric measures and static grip strength of population of Pahang: utilization for hand-held product design Member 25-MAY-2016 24-MAY-2018 Selesai (Tidak Mencapai KPI)
13. Embedded Ergonomic in Design for Assembly of Automotive Body Sub-Components Member 05-APR-2016 04-APR-2018 Selesai (Mencapai Semua KPI)
14. A Study of Lean Manufacturing Implementation in SME - Automotive component Industry� Leader 25-JUN-2015 24-JUN-2017 Selesai (Tutup Projek)
15. Modelling and Optimization of Assembly Line Balancing with Multi-Resource Constraints Member 01-JUL-2014 30-JUN-2017 Selesai (Tutup Projek)
16. MONITORING AND OPTIMIZATION OF SUPPLY CHAIN ON DEIONISED VACUUM LAB GLASS BOTTLE FOR CHEMICAL MANUFACTURING LNDUSTRY Member 16-JUN-2014 15-JUN-2017 Selesai (Tutup Projek)
17. Modeling and Optimization of Automotive Manufacturing Layout to Enhance Productivity Member 01-DEC-2013 30-NOV-2015 Selesai (Tutup Projek)
18. To Develop a Modified Ductile Ni-Resist Alloy using Casting Austempered Process for Elevated Temperature Components Member 17-SEP-2013 16-SEP-2015 Selesai (Tutup Projek)
19. Inovasi Dalam Rekabentuk Peralatan dan Susunan Kerja Yang Teratur Dalam Industri Memproses Keropok Ikan Member 15-JUL-2013 14-JUL-2015 Selesai (Mencapai Semua KPI)
20. Experimental and Numerical Study of Geometry Variability in Cold Roll Forming Process of Advanced High Strength Steel (AHSS)� Member 25-JUN-2013 24-SEP-2015 Selesai (Tutup Projek)
21. Development of a Portable Quality-Confirmation Inspection Unit for Automotive Checking Fixture Member 15-MAY-2013 14-MAY-2015 Selesai (Tutup Projek)
22. DESIGN AND DEVELOPMENT OF PLUG IN ELECTRIC VEHICLE FOR PROTON GREEN MOBILITY CHALLENGE (PGMC) 2012: THE UMP-EV TEAM Member 20-JAN-2012 30-SEP-2012 Tamat (Perlu hantar laporan akhir)
23. Numerical Study on Fatigue Life on Spot Welded Automotive Components. Member 09-JAN-2007 31-AUG-2008 Selesai (Mencapai Semua KPI)
24. Development of Laser Cutting and Engraving Machine Utilising PC-NC Controller Member 04-JAN-2007 30-MAR-2008 Selesai (Mencapai Semua KPI)
   
PUBLICATION
TYPE PUBLICATION TARIKH PENERBITAN TYPE OF CONTRIBUTION
REFEREED PUBLICATION
JOURNAL critical success factors for implementing lean manufacturing Malaysian automotive component 05/09/2014 Citation 15
   

For best view, please use Mozilla Firefox, Internet Explorer 7.0 or above with resolution 1024 x 768 pixel.

Copyright 2011 Universiti Malaysia Pahang