NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
AN ERGONOMIC-BASEDDESIGN OF ABLUTION UNIT FOR WUDHU USING QUALITY FUNCTION DEPLOYMENT APPROACH |
Member |
20-JUN-2017 |
19-JUN-2019 |
Tamat (Laporan akhir dalam semakan) |
2. |
Multi-robot Hybrid Control System for Scalable Communication in Automotive Industry |
Member |
15-SEP-2015 |
14-SEP-2017 |
Tamat (Perlu hantar laporan akhir) |
3. |
Product Development of Metal Matrix Composites Automotive Component using Concurrent Engineering Strategy |
Member |
25-OCT-2014 |
24-OCT-2016 |
Selesai (Tutup Projek) |
4. |
Simulation and Evaluation of Assembly Line Balancing in Perodua Manufacturing Plant |
Member |
15-AUG-2014 |
14-AUG-2016 |
Selesai (Tutup Projek) |
5. |
An Improved Decision Support Tool for Dynamics Job Shop Scheduling |
Member |
15-MAY-2014 |
14-MAY-2016 |
Selesai (Tutup Projek) |
6. |
Enhancing the Electrical Discharge Machining of Metallic Reinforced Ceramic Composites |
Member |
01-DEC-2013 |
01-MAY-2016 |
Selesai (Tutup Projek) |
7. |
Developing Quantitative Performance Measurement Audit Tool of Lean Manufacturing Performance using Critical Success Failure (CSF) Technique |
Member |
25-JUN-2013 |
24-JUN-2015 |
Selesai (Tutup Projek) |
8. |
Multi-Mode Failures Modelings in Reliability Engineering Systems with Bayesian Analysis Approach |
Leader |
14-JUN-2013 |
14-DEC-2015 |
Tamat (Perlu hantar laporan akhir) |
9. |
The Impact of Lean Kitting Supply System on Reducing Non Value Added Activates in the Motorcycle Engine Assembly Process |
Member |
01-OCT-2012 |
30-SEP-2014 |
Selesai (Tutup Projek) |