NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
A STUDY ON CULTURE-BASED BEHAVIOURAL SAFETY FOR THE ARTISANAL AND SMALL-SCALE MINING INDUSTRY (UIC241551) |
Leader |
01-NOV-2024 |
31-OCT-2025 |
Sedang Berjalan |
2. |
A STUDY ON CULTURE-BASED BEHAVIOURAL SAFETY FOR THE ARTISANAL AND SMALL-SCALE MINING INDUSTRY (RDU242748) |
Leader |
01-NOV-2024 |
31-OCT-2025 |
Sedang Berjalan |
3. |
Latihan Pengurusan Bersepadu Halal dan Toyyib bersama para pengusaha kedai makan dan penjaja kecil Daerah Kuantan |
Leader |
15-OCT-2024 |
14-OCT-2025 |
Sedang Berjalan |
4. |
Program Kesedaran Perlombongan Lestari dan Alam Sekitar Kepada Penduduk Kampung dan Pelombong-Pelombong Kecil di Mukim Kechau, Kuala Lipis, Pahang |
Member |
15-OCT-2024 |
14-OCT-2025 |
Sedang Berjalan |
5. |
PROGRAM LATIHAN PENYELARAS DAN PEMBANGUNAN SISTEM ASAS KESELAMATAN DAN KESIHATAN PEKERJAAN DI SEKOLAH-SEKOLAH ALIRAN AGAMA DI NEGERI PAHANG |
Leader |
28-DEC-2022 |
27-DEC-2023 |
Tamat (Perlu hantar laporan akhir) |
6. |
MECHANICAL PROPERTIES ENHANCEMENT IN A POLY(LACTIC
ACID)/GRAPHENE NANOPLATELET (GNP) WITH RUBBER |
Member |
25-DEC-2022 |
24-DEC-2024 |
Sedang Berjalan |
7. |
PHASE 1: TO DEVELOP A WORKING PROTOTYPE OF TRIUMPH - A
GENOME-BASED APPROACH FOR MICROBIAL PROFILING, TARGETED GENE PANEL FOR PATHOGENIC MARKERS, AND SEQUENCING PIPELINES ON ONT |
Member |
01-AUG-2022 |
31-JUL-2024 |
Sedang Berjalan |
8. |
DEVELOPMENT, MAINTENANCE AND BUILDING INFRASTRUCTURE ASSESSMENT: MUIP'S EDUCATIONAL ENTITY |
Leader |
02-MAR-2022 |
01-MAR-2024 |
Tamat (Perlu hantar laporan akhir) |
9. |
DEVELOPMENT OF THE INDUSTRIAL RISK REDUCTION AND RESILIENCE (I3R) FRAMEWORK MODEL FOR MAJOR INDUSTRIAL AREA IN MALAYSIA |
Leader |
01-MAY-2021 |
30-APR-2023 |
Tamat (Perlu hantar laporan akhir) |
10. |
DEVELOPMENT OF IMPROVED DURABILITY AND LOW COST SOLID ANKLE-CUSHION HEEL (SACH) PROSTHETIC FOOT |
Member |
26-MAR-2021 |
25-MAR-2023 |
Tamat (Perlu hantar laporan akhir) |
11. |
Program Membangun Pelan Tindak Balas Kecemasan Dan Pengungsian di Sekolah-sekolah dan Maahad Tahfiz Kelolaan MUIP
|
Leader |
30-JUN-2020 |
31-DEC-2021 |
Tamat (Laporan akhir dalam semakan) |
12. |
CRG 36.4 Dust Explosion assessment on metal solids for ignition sensitivity of biofibers flame retardants (FRs) composites |
Member |
01-NOV-2019 |
31-OCT-2021 |
Selesai (Mencapai Sebahagian KPI) |
13. |
Investigate of Iron Nano Particle Coated Graphene in
Biodegradable Composites
|
Member |
01-NOV-2019 |
31-JAN-2022 |
Tamat (Perlu hantar laporan akhir) |
14. |
Elucidation of Experts Perceptions Conversion into Pseudo-Quantitative Likelihood for Decision Making of Pipeline Maintenance |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Tidak Mencapai KPI) |
15. |
Risk Assessment Technique-Workplace Risk Assessment for Pusat Latihan Teknologi Tinggi (ADTEC)-TVET Institue, Jerantut, Pahang |
Leader |
01-JUN-2019 |
30-MAY-2020 |
Tamat (Tutup Projek) |
16. |
ISOLATION OF MESOPHILIC PLA-DEGRADING BACTERIA FROM LANDFILLS AND ITS DEGRADATION MECHANISM. |
Member |
30-DEC-2018 |
29-MAR-2021 |
Selesai (Mencapai Semua KPI) |
17. |
MERCURY REMOVAL USING IMPREGNATED EMPTY FRUIT BUNCH ACTIVATED CARBON |
Member |
05-MAY-2018 |
04-AUG-2020 |
Tamat (Perlu hantar laporan akhir) |
18. |
Air pollution assessment on particulate matter dispersion at mega construction site |
Leader |
30-JUN-2017 |
29-JUN-2019 |
Selesai (Mencapai Semua KPI) |
19. |
A dynamic Bayesian network approach for decision support in risk assessment of oil and gas pipeline |
Member |
30-JUN-2017 |
29-JUN-2019 |
Selesai (Mencapai Semua KPI) |
20. |
Effects Of Solvent Extraction Of Anthocyanin From Butterfly Pea |
Member |
01-MAR-2017 |
01-MAR-2019 |
Selesai (Mencapai Semua KPI) |
21. |
Mechanical, Thermal, Electrical And Flammability Properties Of Rubber Toughened Polystyrene/Graphene Nanocomposites |
Member |
01-MAR-2017 |
01-MAR-2019 |
Selesai (Mencapai Semua KPI) |
22. |
Innovative Methodologies for the Utilization of Heterogeneous Plastic Waste and Manufacture of Possible Value-Added Products |
Member |
15-DEC-2010 |
14-DEC-2012 |
Tamat (Perlu hantar laporan akhir) |
23. |
A Study on a Pattern Recognition Using Mahalanobis Distance (MD) for Prediction of Local Exhaust Ventilation (LEV) System Performance |
Member |
01-AUG-2010 |
31-JAN-2013 |
Selesai (Mencapai Semua KPI) |
24. |
Membangunkan Modul Bina Insan Menggunakan Konsep âAkinnahâ kepada Pelajar Kejuruteraan |
Member |
01-AUG-2010 |
31-OCT-2012 |
Tamat (Perlu hantar laporan akhir) |