NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
DEVELOPMENT OF SAFETY-ORIENTED STANDARD OPERATING PROCEDURE (SOP) FOR INTEGRATED BIOGAS AND HYDROGEN ENERGY PILOT PLANT (RDU242718) |
Member |
07-JUN-2024 |
06-JUN-2025 |
Sedang Berjalan |
2. |
DEVELOPMENT OF SAFETY-ORIENTED STANDARD OPERATING PROCEDURE (SOP) FOR INTEGRATED BIOGAS AND HYDROGEN ENERGY PILOT PLANT (UIC241527) |
Member |
07-JUN-2024 |
06-JUN-2025 |
Sedang Berjalan |
3. |
MODUL PEMINDAHAN ILMU PENGETAHUAN BERKAITAN TATACARA PENGENDALIAN BAHAN KIMIA DAN PENGURUSAN SISA KIMIA BERBAHAYA YANG SISTEMATIK DI SEKOLAH DAERAH KUANTAN BERSAMA JABATAN |
Member |
25-DEC-2023 |
24-DEC-2025 |
Sedang Berjalan |
4. |
IGNITION SENSITIVITY AND EXPLOSION CHARACTERISTICS OF PALM KERNEL SHELL |
Member |
15-DEC-2022 |
14-DEC-2024 |
Sedang Berjalan |
5. |
A STUDY ON THE PREVALENCE OF FORGOTTEN CHILD IN PARKED
VEHICLES AMONG MALAYSIANS: IN CONJUNCTION WITH CHILD PRESENCE DETECTION (CPD) SYSTEM IN THE FUTURE ASEAN NCAP PROTOCOL |
Member |
01-JUL-2022 |
30-JUN-2023 |
Tamat (Perlu hantar laporan akhir) |
6. |
INVESTIGATION ON PHYSICAL AND PSYCHOSOCIAL RISK FACTORS WITH THE FATIGUE LEVEL AMONG MALE COURIER SERVICE WORKERS AFTER SUDDEN INFLUX IN DELIVERY DEMANDS DUE TO COVID19 PANDEMIC |
Member |
07-SEP-2021 |
06-SEP-2023 |
Tamat (Perlu hantar laporan akhir) |
7. |
ELUCIDATE THE MECHANISM AND KINETICS OF CO2 ADSORPTION PROCESS ON METAL-ORGANIC FRAMEWORKS (MOF) MATERIALS FOR CO2 CHEMICAL STORAGE |
Member |
07-SEP-2021 |
06-SEP-2023 |
Tamat (Perlu hantar laporan akhir) |
8. |
INTEGRATED PLANNING AND MANAGEMENT MODEL TO REGULATE CO2 EMISSION |
Leader |
01-SEP-2021 |
31-AUG-2023 |
Tamat (Perlu hantar laporan akhir) |
9. |
INTEGRATION PROJECT FOR FPG OLEOCHEMICAL SLUDGE WASTE MANAGEMENT (RDU192811) |
Member |
07-SEP-2020 |
05-JUN-2022 |
Tamat (Perlu hantar laporan akhir) |
10. |
INTEGRATION PROJECT FOR FPG OLEOCHEMICAL SLUDGE WASTE MANAGEMENT (UIC190817) |
Member |
07-SEP-2020 |
05-JUN-2022 |
Tamat (Perlu hantar laporan akhir) |
11. |
Production and performance of bio-based fertilizer on the yield of Solanum Lycopersicum |
Member |
01-NOV-2019 |
31-OCT-2021 |
Tamat (Perlu hantar laporan akhir) |