NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
DEVELOPMENT OF INTELLIGENT COMPUTATIONAL TOOL TO OPTIMIZE STUDENT ACADEMIC LOAD |
Leader |
01-DEC-2023 |
30-NOV-2025 |
Sedang Berjalan |
2. |
AN IMPROVED ARITHMETIC OPTIMIZATION ALGORITHM FOR COST-BASED HYBRID FLOWSHOP
OPTIMIZATION |
Leader |
15-JUL-2023 |
14-JUN-2026 |
Sedang Berjalan |
3. |
PARAMETRIC INVESTIGATIONS AND OPTIMIZATION OF VARIOUS FLEXURE BEARING DESIGN TOPOLOGIES |
Member |
15-DEC-2022 |
14-DEC-2024 |
Sedang Berjalan |
4. |
MODELING AND OPTIMIZATION OF COST-BASED HYBRID FLOWSHOP SCHEDULING IN AUTOMOTIVE COMPONENT PRODUCTION |
Leader |
15-NOV-2022 |
14-NOV-2024 |
Sedang Berjalan |
5. |
OPTIMISATION OF PI-PD CONTROLLER FOR DC MOTOR POSITION OF THE LINEAR CONVEYOR SYSTEM USING MODIFIED ADAPTIVE BATS SONAR ALGORITHM. |
Member |
01-OCT-2021 |
30-SEP-2023 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
6. |
MULTI-STAGE FLOW SHOPS SCHEDULING WITH ENERGY UTILIZATION USING METAHEURISTIC OPTIMIZATION FOR AUTOMOTIVE COMPONENT PLANT |
Member |
01-APR-2021 |
31-MAR-2023 |
Tamat (Perlu hantar laporan akhir) |
7. |
ERGONOMICS AUTOMOTIVE WELDING WORKSTATION SET-UP MODELLING FOR MUSCULOSKELETAL DISORDERS (MSD) ISSUES |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Tidak Mencapai KPI) |
8. |
Formulation of A Combinatorial Permutation-Based Metaheuristic Algorithm to Optimize Energy Utilization in Assembly Line |
Leader |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Tidak Mencapai KPI) |
9. |
IMPROVEMENT OF ENERGY IN PRODUCTION LINES, HEATING VETILATION AND AIR CONDITION (HVAC) INTEGRATION SYSTEMS AT ELECTRONICS COMPANY (RDU192807) |
Member |
20-MAY-2019 |
17-NOV-2021 |
Tamat (Perlu hantar laporan akhir) |
10. |
IMPROVEMENT OF ENERGY IN PRODUCTION LINES, HEATING VETILATION AND AIR CONDITION (HVAC) INTEGRATION SYSTEMS AT ELECTRONICS COMPANY (UIC190815) |
Member |
20-MAY-2019 |
17-NOV-2021 |
Tamat (Perlu hantar laporan akhir) |
11. |
ENERGY UTILIZATION MODELLING AND OPTIMIZATION FOR MACHINE SCHEDULING PROBLEM IN PRODUCTION |
Leader |
01-APR-2019 |
30-JUN-2021 |
Selesai (Mencapai Semua KPI) |
12. |
Enhancement Small Medium Enterprise (SMEs)Performance through Integrating lean manufacturing (LM) and industrial revolution 4.0 (IR 4.0) - Automotive component industry |
Member |
01-JAN-2019 |
30-SEP-2021 |
Selesai (Tidak Mencapai KPI) |
13. |
FRAMEWORK DEVELOPMENT FOR SPECIAL PURPOSE VEHICLE (SPV) ASSEMBLY LINE OPTIMISATION UTILISING WITNESS SIMULATION AND ERGONOMIC ANALYSIS |
Member |
25-SEP-2018 |
24-DEC-2020 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
14. |
INVESTIGATION OF BATS ECHOLOCATION-INSPIRED ALGORITHM TO SOLVE MANY OBJECTIVE OPTIMISATION PROBLEM OF CAR SIDE IMPACT DESIGN |
Member |
25-APR-2018 |
24-JUL-2020 |
Selesai (Tidak Mencapai KPI) |
15. |
ROBUST SUPPLY CHAIN RISK MANAGEMENT MODELS TO OPTIMIZE TOTAL SUPPLY CHAIN COST IN AN UNCERTAIN ENVIRONMENT THROUGH SOFT COMPUTING |
Member |
15-APR-2018 |
21-JAN-2020 |
Diberhentikan/Ditamatkan |
16. |
MODELLING AND OPTIMIZATION OF ASSEMBLY SEQUENCE PLANNING FOR AUTOMOTIVE SUBASSEMBLY |
Leader |
05-APR-2018 |
04-JUL-2020 |
Selesai (Mencapai Semua KPI) |
17. |
Optimization of Biowaste-Diesel Fuel to Improve the Engine Performance and Emission |
Member |
28-JUN-2017 |
27-JUN-2019 |
Tamat (Perlu hantar laporan akhir) |
18. |
Optimization Of Assembly Sequence Planning Using Ant Colony Optimization Algorithm |
Leader |
01-MAR-2017 |
01-MAR-2019 |
Selesai (Mencapai Semua KPI) |
19. |
Optimization of Double Sided Assembly line Balancing with Resource Constraints |
Leader |
01-MAR-2017 |
01-MAR-2019 |
Selesai (Mencapai Semua KPI) |
20. |
Modelling and Optimization of Mixed Model Assembly Line Problem with Resource Constraints |
Leader |
01-MAR-2017 |
01-MAR-2019 |
Selesai (Mencapai Semua KPI) |
21. |
Development of knowledge based ergonomics assessment system at workplace in automotive assembly plan |
Member |
25-JUN-2016 |
24-JUN-2018 |
Selesai (Mencapai Semua KPI) |
22. |
ERGONOMICS STUDY ON MUSCULOSKELETAL DISORDERS (MSD) RELATED PROBLEMS AMONG WORKERS IN ELECTRONICS ASSEMBLY LINE� |
Member |
25-JUN-2016 |
24-JUN-2018 |
Selesai (Mencapai Sebahagian KPI) |
23. |
Modeling and Optimization of Multi-holes Drilling Path using Particle Swarm Optimization |
Leader |
25-MAY-2016 |
24-MAY-2018 |
Selesai (Mencapai Semua KPI) |
24. |
Embedded Ergonomic in Design for Assembly of Automotive Body Sub-Components |
Member |
05-APR-2016 |
04-APR-2018 |
Selesai (Mencapai Semua KPI) |
25. |
Investigation of The Rigidity of CoCrMo Cellular Structure Fabricated by Selective Laser Melting Process for Potential Dental Applications |
Member |
01-JAN-2016 |
31-DEC-2018 |
Selesai (Mencapai Semua KPI) |
26. |
A Study of Lean Manufacturing Implementation in SME - Automotive component Industry� |
Member |
25-JUN-2015 |
24-JUN-2017 |
Tamat (Tutup Projek) |
27. |
Multi-Objective Optimisation of Simple Assembly Line Balancing Type-E |
Leader |
15-MAR-2015 |
14-MAR-2017 |
Selesai (Tidak Mencapai KPI) |
28. |
New Approach of Ankle Morphometric Measurements for Total Ankle Arthroplasty (TAR) Design |
Member |
25-OCT-2014 |
24-OCT-2016 |
Tamat (Tutup Projek) |
29. |
Pemindahan Teknologi Sistem Kawalan, Rekabentuk Percetakan Plastik dan Pengurusan Kejuruteraan Dalam Industri Plastik |
Member |
01-SEP-2014 |
31-AUG-2016 |
Tamat (Perlu hantar laporan akhir) |
30. |
Modelling and Optimization of Assembly Line Balancing with Multi-Resource Constraints
|
Leader |
01-JUL-2014 |
30-JUN-2017 |
Tamat (Tutup Projek) |
31. |
Peningkatan Produktiviti Pengeluaran Baja Cecair Kilang IKS Melalui Penambahbaikan Sistem Operasi dan Pengurusan Bahan Mentah |
Member |
15-FEB-2014 |
14-FEB-2016 |
Selesai (Mencapai Semua KPI) |
32. |
Modeling and Optimization of Automotive Manufacturing Layout to Enhance Productivity |
Leader |
01-DEC-2013 |
30-NOV-2015 |
Tamat (Tutup Projek) |
33. |
Development Of Low-Cost Pneumatic Controller For Industrial Application |
Leader |
05-JAN-2009 |
30-OCT-2010 |
Tamat (Perlu hantar laporan akhir) |
34. |
Analysis of Laser-Micromachining of Silicon for MEMS Components |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
35. |
Development Of A Drum Cutting And Clamping Machine For Industrial Application |
Member |
09-JAN-2007 |
31-AUG-2008 |
Selesai (Mencapai Semua KPI) |
36. |
Design & Simulation of Robotic Welding System for Automotive Manufacturing |
Member |
26-JAN-2004 |
31-JAN-2005 |
Selesai (Mencapai Semua KPI) |