NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
FORMULATION OF A MATHEMATICAL MODEL OF A STABLE DYNAMIC RANGE MOBILE ROBOT LOCALIZATION IN UNSTRUCTURED ENVIRONMENT |
Leader |
15-OCT-2020 |
14-OCT-2022 |
Tamat (Perlu hantar laporan akhir) |
2. |
FIR Optimizer: A New Optimization Algorithm Based on Finite Impulse Response Estimator |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
3. |
NEURAL NETWORK FOR PEAK DETECTION OF EEG SIGNALS WITH FEATURE SELECTION BASED ON SIMULATED KALMAN FILTER ALGORITHMS |
Leader |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
4. |
Early Detection of Spots High Water Saturation for Landslide Prediction using Thermal Imaging Analysis |
Member |
25-APR-2014 |
24-APR-2016 |
Selesai (Tutup Projek) |
5. |
Formulation of a New Learing and Modification of Learing Algorithm Improve Weighted Kernel Regression (WKR) for the case of Regression Problem with Limied and Noisy Training Samples |
Member |
17-SEP-2013 |
16-SEP-2015 |
Selesai (Tutup Projek) |
6. |
In Search for Mathematical Model : The Potential of Optimization Algorithms in System Identification |
Member |
01-JUN-2013 |
31-MAY-2016 |
Selesai (Tutup Projek) |
7. |
A Study on the Contribution of Nearest-Neighbor Thermodynamic Parameters to the DNA Sequences Generated by Ant Colony System (ACS) Algorithm |
Member |
15-DEC-2012 |
14-DEC-2014 |
Selesai (Mencapai Semua KPI) |
8. |
An Improved Vector Evaluated Particle Swarm Optimization Algorithm by Incorporating a non-Dominated Solution for Multi-Objective Optimization Problems |
Member |
15-DEC-2012 |
14-DEC-2014 |
Selesai (Mencapai Semua KPI) |
9. |
A New Robust Object Tracking Algorithm using sparse Approximation Method |
Member |
15-DEC-2012 |
14-DEC-2014 |
Selesai (Mencapai Semua KPI) |
10. |
Development of an Intelligent System for Biomedical Engineering-The Automatic Detection of Intestinal Parasites and Protozoan Infections Base on Fecal Sample |
Member |
01-APR-2012 |
31-MAR-2014 |
Tamat (Perlu hantar laporan akhir) |
11. |
Development of High Energetic Materials from Renewable Energy Resources |
Member |
15-MAY-2011 |
15-MAY-2012 |
Tamat (Perlu hantar laporan akhir) |
12. |
Computational Intelligence Application To Malaysian Power System |
Member |
01-MAY-2009 |
31-AUG-2010 |
Tamat (Perlu hantar laporan akhir) |
13. |
Development of Mobile Phone Qibla and Prayer Time Finder Using External Global Positional System (GPS) and Digital Compass System |
Member |
01-MAY-2009 |
30-APR-2011 |
Selesai (Tutup Projek) |
14. |
Integrated Network Security System For Industry Security |
Leader |
01-MAY-2009 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
15. |
Crowd Movement Detection For Automated Surveillance Camera System |
Member |
01-MAY-2009 |
31-DEC-2010 |
Selesai (Mencapai Semua KPI) |
16. |
Development of Computer-Based Control System For Motor Applications |
Member |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |