NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
Building the Engineers of Tomorrow: ROV Knowledge Transfer to Students |
Member |
15-OCT-2024 |
14-OCT-2025 |
Sedang Berjalan |
2. |
Pemerkasaan dan Pembudayaan Digitalisasi dan Internet of Things (IOT) di Kolej Vokasional |
Leader |
15-OCT-2024 |
14-OCT-2025 |
Sedang Berjalan |
3. |
DEVELOPMENT OF AN EFFECTIVE OVERALL EQUIPMENT EFFECTIVENESS (OEE) TRAINING SYSTEM |
Member |
15-FEB-2024 |
14-FEB-2026 |
Sedang Berjalan |
4. |
EMPOWERING SCHOOL INNOVATION: WIRELESS TIMING GATE FOR AMPHIBIAN ELECTRIC VEHICLE (AEV) AND ROBOT TRACER TRAINING AND COMPETITION IN PEKAN DISTRICT SCHOOLS |
Member |
25-DEC-2023 |
24-DEC-2025 |
Sedang Berjalan |
5. |
DEVELOPMENT OF TRAINING KIT DC-DC CONVERTER FOR POWER ELECTRONICS FIELD |
Member |
15-OCT-2023 |
14-OCT-2025 |
Sedang Berjalan |
6. |
DEVELOPMENT OF REMOTELY UNDERWATER CLEANING ROBOT |
Member |
01-APR-2023 |
31-MAR-2024 |
Tamat (Perlu hantar laporan akhir) |
7. |
DEVELOPMENT OF SMART AUTONOMOUS LAWN MOWER BY USING ARDUPILOT |
Member |
15-JUN-2021 |
14-JUN-2023 |
Tamat (Perlu hantar laporan akhir) |
8. |
DEVELOPMENT OF A REAL TIME REMOTE LABORATORY FOR ELECTRONICS COURSES
|
Member |
01-JUN-2021 |
31-MAY-2023 |
Tamat (Perlu hantar laporan akhir) |
9. |
NEW SIGMA POINT UNSCENTED SMOOTHING ALGORITHM BASED ON RAUCH-TUNG-STRIEBEL SMOOTHER FOR AUTONOMOUS ROBOT LOCALIZATION PROBLEM |
Leader |
20-OCT-2020 |
19-OCT-2022 |
Tamat (Perlu hantar laporan akhir) |
10. |
SEAT BELT MONITORING AND ALERT SYSTEM FOR CAR SAFETY
|
Member |
30-DEC-2018 |
29-MAR-2021 |
Selesai (Mencapai Sebahagian KPI) |
11. |
USB LED Lighting Tube |
Member |
15-AUG-2017 |
14-AUG-2018 |
Selesai (Mencapai Semua KPI) |
12. |
THE DEVELOPMENT OF A MID INFRARED ABSORPTION SPECTROSCOPIC OPTICAL FIBER BASED GAS SENSING SYSTEM FOR MULTIPLE GAS DETECTION |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Sebahagian KPI) |
13. |
CONTROL SCHEME FOR VEHICLE STEERING BY WIRE (VSBW) SYSTEM |
Leader |
20-JUN-2017 |
19-JUN-2019 |
Tamat (Tutup Projek) |
14. |
A STUDY ON DATA DRIVEN IMPEDANCE MATCHING IN FOUR-CHANNELS BILATERAL TELEOPERATION |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
15. |
DEVELOPMENT OF A SENSITIVE MAGNETOMETER PROTOTYPE FOR DEFECT EVALUATION IN STEEL COMPONENTS |
Member |
15-MAY-2017 |
14-MAY-2019 |
Selesai (Mencapai Semua KPI) |
16. |
DIAGONALIZATION OF COVARIANCE MATRIX IN MOBILE ROBOT SIMULTANEOUS LOCALIZATION AND MAPPING |
Member |
01-MAY-2017 |
01-MAY-2019 |
Tamat (Tutup Projek) |
17. |
ACTIVE STABILITY CONTROL MODEL OF LATERAL VEHICLE DYNAMICS TO IMPROVE VEHICLE COMFORT LEVEL |
Member |
01-MAY-2017 |
01-MAY-2019 |
Selesai (Mencapai Sebahagian KPI) |
18. |
Investigation of Vehicle States and Measurement Model in H Infinity Filter based Navigation |
Member |
01-AUG-2016 |
31-JUL-2019 |
Selesai (Mencapai Semua KPI) |
19. |
Adaptive Energybased Impedance Control and Optimal Kinodynamics Planning for the Class of Underactuated Euler-Lagrange System: Stable Turning Periodic Motion Cases |
Member |
01-AUG-2016 |
31-JUL-2018 |
Selesai (Mencapai Semua KPI) |
20. |
Investigating the Magnetic Fluid Characteristics in Low Concentration Solutions to Enhance Harmonics Generation |
Member |
01-AUG-2016 |
31-JUL-2018 |
Selesai (Mencapai Semua KPI) |
21. |
FUZZY LOGIC BASED MOBILE ROBOT NAVIGATION SYSTEM FOR ENVIRONMENT OBSERVATIONS |
Member |
25-JUN-2016 |
24-JUN-2018 |
Selesai (Mencapai Semua KPI) |
22. |
Intelligent Energy Management System of Series Hybrid Electric Vehicle (HEV) |
Member |
25-JUN-2016 |
24-JUN-2018 |
Tamat (Tutup Projek) |
23. |
Pemindahan Kepakaran Merekabentuk dan Pengaturcaraan Robot Lego Mindstorm Bagi Meningkatkan Tahap Kreativiti dan Inovasi di Kalangan Guru-guru dan Pelajar-pelajar di Sekolah Rendah dan Menengah Sekitar UMP Pekan dengan Kerjasama Pejabat Pendidikan Daerah Pekan |
Member |
01-DEC-2015 |
30-NOV-2017 |
Selesai (Mencapai Semua KPI) |
24. |
Extended Kalman Filter (EKF)-based Modular-Stack Vanadium Redox Flow Battery (V-RFB) prediction model development for reducing electrode contact resistance and parallelization current |
Member |
02-NOV-2015 |
01-NOV-2018 |
Selesai (Mencapai Sebahagian KPI) |
25. |
Hybrid Remotely Controlled and Automonous on Heavy Roll Handling Automatic Guided Vehicle for Narrow and Confine Area |
Member |
25-JUN-2015 |
24-JUN-2017 |
Tamat (Tutup Projek) |
26. |
Large Airport gate Allocation Scheduling Based on Advanced Computational Intelligence Algorithm |
Member |
01-SEP-2014 |
31-AUG-2016 |
Selesai (Mencapai Semua KPI) |
27. |
Development of a Wall Climbing Robot for Industrial Inspection |
Member |
15-MAY-2014 |
14-MAY-2016 |
Tamat (Tutup Projek) |
28. |
A Spherical Simplex Sampling Technique for An Unscented FastSLAM in Solving a Simultaneous Localization and Mapping (SLAM) problem |
Leader |
01-DEC-2013 |
30-NOV-2015 |
Selesai (Tidak Mencapai KPI) |
29. |
Study On Object's Contour Construction Based On Moving RGB Depth Sensor And Laser Range Sensor |
Member |
01-DEC-2013 |
30-NOV-2015 |
Selesai (Mencapai Semua KPI) |
30. |
A New Samping Technique for and Unscented FastSLAM in Solving a Simulteneous Localization and Mappng (SLAM) Problem |
Leader |
01-DEC-2013 |
30-NOV-2015 |
Tamat (Tutup Projek) |
31. |
Autonomous Vision-Based Underwater Mapping Technique for Legged Robot Navigation |
Member |
25-NOV-2013 |
24-NOV-2015 |
Tamat (Tutup Projek) |
32. |
Fuzzy Logic Grasping Control Considering Multiple Objects Features |
Member |
01-JUN-2013 |
31-MAY-2015 |
Tamat (Tutup Projek) |
33. |
In Search for Mathematical Model : The Potential of Optimization Algorithms in System Identification |
Member |
01-JUN-2013 |
31-MAY-2016 |
Tamat (Tutup Projek) |
34. |
Vision Project Improvement at Unit Production Development (UPD), Infineon, Melaka |
Leader |
15-APR-2013 |
14-APR-2014 |
Tamat (Tutup Projek) |
35. |
State Covariance Analysis for Adaptive Fuzzy Extended
Kalman Filter in Mobile Robot Localization Considering
Noise Divergence
|
Member |
01-APR-2013 |
31-MAR-2015 |
Selesai (Mencapai Semua KPI) |
36. |
Development of a Machine Vision System For Oil Palm Fruits Grading |
Member |
03-SEP-2007 |
09-FEB-2008 |
Selesai (Mencapai Semua KPI) |
37. |
Development Of A Student Attendance Using Vicinity RFID System |
Leader |
03-SEP-2007 |
09-FEB-2008 |
Selesai (Mencapai Semua KPI) |
38. |
Development of Computer-Based Control System For Motor Applications |
Member |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |
39. |
Design of Casting Process Control System for Automatic Flat Sheet Membrane Casting Machine. |
Member |
01-NOV-2005 |
31-OCT-2006 |
Diberhentikan/Ditamatkan |
40. |
Automatic Controller Design For SMI Production Station. |
Member |
01-FEB-2005 |
31-JAN-2006 |
Selesai (Mencapai Semua KPI) |