NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
THERMAL EFFECT INVESTIGATION ON DC-FAST ELECTRIC VEHICLE CHARGING CABLES (UIC240816) |
Leader |
01-MAY-2024 |
30-APR-2026 |
Sedang Berjalan |
2. |
THERMAL EFFECT INVESTIGATION ON DC-FAST ELECTRIC VEHICLE CHARGING CABLES (RDU242404) |
Leader |
01-MAY-2024 |
30-APR-2026 |
Sedang Berjalan |
3. |
DEVELOPMENT OF SMART WATER SURGE WARNING SYSTEM |
Member |
01-FEB-2024 |
08-FEB-2026 |
Sedang Berjalan |
4. |
(EQUIPMENT) MOVEABLE ELECTRIC VEHICLE DC CHARGING PILE
|
Leader |
21-MAR-2023 |
31-DEC-2023 |
Tamat (Perlu hantar laporan akhir) |
5. |
FORMULATION OF AN IMPROVED SMOOTHED FUNCTIONAL ALGORITHM USING NORM-LIMITED FUNCTION FOR STABLE CONVERGENCE IN MODEL-FREE CONTROL SCHEME |
Leader |
01-SEP-2022 |
31-AUG-2024 |
Sedang Berjalan |
6. |
AN IMPROVED SMOOTHED FUNCTIONAL ALGORITHM BY USING NORM-LIMITED UPDATE VECTOR FOR STABLE CONVERGENCE IN MODEL-FREE CONTROL SCHEME |
Member |
15-JUL-2022 |
14-JUL-2024 |
Sedang Berjalan |
7. |
ESTABLISHMENT OF MODIFIED MULTI-VERSE OPTIMIZER FOR SYSTEM IDENTIFICATIONS OF NONLINEAR SYSTEMS |
Leader |
15-DEC-2019 |
14-MAR-2022 |
Selesai (Mencapai Semua KPI) |
8. |
DEVELOPMENT OF A TOOL TO HELP IMAM FLIPPING THE QURAN WHILE PERFORMING SOLAH WITHOUT MAJOR MOVEMENT |
Member |
01-JAN-2019 |
30-JUN-2019 |
Tamat (Tutup Projek) |
9. |
New Formulation of Power Dispatch Solution Based on Moth-Flame Optimizer for Power System Planning and Operation |
Leader |
15-AUG-2017 |
14-AUG-2019 |
Selesai (Tidak Mencapai KPI) |
10. |
USB LED Lighting Tube |
Member |
15-AUG-2017 |
14-AUG-2018 |
Selesai (Mencapai Semua KPI) |
11. |
ON-SITE CONDITION MONITORING OF PV MODULES ASSISTED BY AERIAL THERMOGRAPHIC IMAGE ANALYSIS |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
12. |
Development of fish cupula inspired multi-fluidic sensor for liquid slosh detection. |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
13. |
ADAPTIVE CONTROLLER OF SMART MICRO GRID IN INTENTIONAL ISLANDING MODE |
Member |
20-JUN-2017 |
19-JUN-2019 |
Tamat (Perlu hantar laporan akhir) |
14. |
INTERACTIVE CONTROL ALGORITHM BASED ON REAL-TIME SOLAR IRRADIANCE FORECASTING MODEL FOR STANDALONE PHOTOVOLTAIC SYSTEM |
Member |
01-MAY-2017 |
01-MAY-2019 |
Selesai (Tidak Mencapai KPI) |
15. |
Design and development of Battery Management System for 18650 Lithium-Ion Battery for Electric Vehicle |
Leader |
25-MAY-2016 |
24-MAY-2017 |
Selesai (Tidak Mencapai KPI) |
16. |
Design of Sensorless Brushless Direct Current Hub Motor Half-Bridge Driver Circuit for Electric Vehicle |
Leader |
25-JUN-2015 |
24-JUN-2017 |
Tamat (Tutup Projek) |
17. |
Hybrid Techno-Economic Forecasting Model of Renewable Energy System at Pekan Coastal Area |
Member |
01-JUN-2014 |
31-MAY-2016 |
Tamat (Tutup Projek) |
18. |
Kajian Rawatan Air Hujan Sebagai Air Minuman Di Rumah Panjang Bair, Betong Sarawak |
Member |
01-DEC-2013 |
28-FEB-2014 |
Tamat (Tutup Projek) |
19. |
Armature Current Decay Sensing Technique; A New Motor Starting Technique for Fast Startup with Low Current |
Member |
01-DEC-2013 |
30-NOV-2016 |
Selesai (Tidak Mencapai KPI) |
20. |
A New Formulation of Cost Function for Economic
Emission Load Dispatch (EELD) Problem with Considering
Electricity Supply Industry in Malaysia
|
Member |
01-APR-2013 |
31-MAR-2015 |
Selesai (Mencapai Semua KPI) |
21. |
New Design of High Efficiency LED Lighting System |
Leader |
15-DEC-2012 |
14-DEC-2014 |
Selesai (Mencapai Semua KPI) |
22. |
WIND AND SOLAR RENEWABLE ENERGY |
Member |
01-JUN-2012 |
31-DEC-2012 |
Tamat (Perlu hantar laporan akhir) |
23. |
Investigation The Viability of Grid Connection Concentrated Photovoltaic (CPV) Technology For Terrestrial Power Generation in Universiti Malaysia Pahang Pekan Campus |
Member |
01-JUN-2012 |
31-MAY-2014 |
Tamat (Perlu hantar laporan akhir) |
24. |
New Design of High Efficiency LED Lighting System |
Leader |
15-AUG-2011 |
15-FEB-2014 |
Tamat (Tutup Projek) |
25. |
The Development of an Effect of Integrated Photovoltaic and Wind Turbine for Distributed Connected |
Member |
15-NOV-2010 |
14-NOV-2012 |
Selesai (Mencapai Semua KPI) |