ACADEMIC STAFF
+  Fakulti Teknologi Kejuruteraan Kimia Dan Proses (103)
+  Fakulti Teknologi Kejuruteraan Awam (80)
+  Fakulti Teknologi Kejuruteraan Elektrik Dan Elektronik (94)
+  Fakulti Komputeran (80)
+  Fakulti Teknologi Kejuruteraan Mekanikal Dan Automotif (89)
+  Fakulti Sains Dan Teknologi Industri (75)
+  Fakulti Teknologi Kejuruteraan Pembuatan Dan Mekatronik (64)
+  Fakulti Pengurusan Industri (48)
+  Pusat Bahasa Moden (58)
 

Search by Name Expertise

Home> FTK1000-FAKULTI TEKNOLOGI KEJURUTERAAN ELEKTRIK DAN ELEKTRONIK

IR. TS. DR. MOHD IKHWAN BIN MUHAMMAD RIDZUAN

Contact No. : 094246026
Gender : MALE
Nationality : MALAYSIA
Current Positon : DS51-A-PENSYARAH UNIVERSITI
E-Mail : ikhwanr@ump.edu.my
 
ACADEMIC QUALIFICATION
. 2017 : IJAZAH KEDOKTORAN (DOCTORAL DEGREE), EDINBURGH UNIVERSITY, SCOTLAND
. 2009 : IJAZAH SARJANA MUDA (BACHELOR DEGREE), UNIVERSITI TEKNOLOGI MALAYSIA, SKUDAI
 
EXPERTISE
EXPERT AREA MAJOR YEARS OF EXPERTISE LEVEL
ELECTRICITY, GAS AND WATER SERVICES AND UTILITIES TRANSMISSION LINES
3
SEDERHANA
ENERGY SECURITY RELIABILITY PERFORMANCE
4
SEDERHANA
 
EMPLOYMENT HISTORY
EMPLOYER POST JOIN DATE RESIGN DATE STATUS
Healthcare Technical Services Sdn Bhd M&E ENGINEER 01/07/2009 30/09/2009 TETAP
Jvc Manufacturing Malaysia Sdn Bhd R&D ENGINEER 01/10/2009 30/10/2009 SEMENTARA
Tenaga Nasional Berhad LINES ENGINEER 02/11/2009 09/10/2012 TETAP
   
RESEARCH
NO. TITLE ROLE START DATE END DATE STATUS
1. A FORMULATION OF HYBRID MONTE-CARLO SIMULATION AND GREY WOLF OPTIMIZATION FOR OPTIMAL DISTRIBUTED GENERATION PLACEMENT AND NETWORK RECONFIGURATION IN FUTURE SMART GRID DISTRIBUTION NETWORKS Leader 01-SEP-2022 31-AUG-2025 Sedang Berjalan
2. FORMULATE ZERO-STATE CONTROL ALGORITHM AS A NEW CONVERTER PROTECTION IN LARGE SCALE GRID-CONNECTED PHOTOVOLTAIC SYSTEM Member 15-JUL-2022 14-JUL-2024 Sedang Berjalan
3. MYSTEM PROJECT: CURIOSITY INSPIRES DISCOVERIES Member 30-DEC-2020 30-SEP-2024 Sedang Berjalan
4. Project Ninja @ UMP STEM Lab Member 01-JAN-2020 31-DEC-2024 Sedang Berjalan
5. Customer-based Reliability and Penalty Risk Assessment Models by using Monte-Carlo Simulation for Malaysia Future Smart Grid Distribution Network Leader 01-JAN-2019 30-SEP-2021 Selesai (Tidak Mencapai KPI)
6. Reliability Performance of Single and Three-phase Network Representation of LV Distribution Leader 30-JUN-2017 29-JUN-2019 Selesai (Mencapai Semua KPI)
   
PUBLICATION
No Record.

   

For best view, please use Mozilla Firefox, Internet Explorer 7.0 or above with resolution 1024 x 768 pixel.

Copyright 2011 Universiti Malaysia Pahang