NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
A RANDOMIZED CONTROLLED TRIAL OF THE EFFECTIVENESS OF REMOTE HEALTH MONITORING BASED ON AI SCHEDULING (ORCUS) ON IMPROVEMENT OF EXERCISE CAPACITY FOR POST ACUTE CORONARY SYNDROME |
Leader |
01-DEC-2023 |
30-NOV-2025 |
Sedang Berjalan |
2. |
INTERGRATED MODELLING AND CONTROL OF LINEAR ACTUATOR BASED AUTOMATIC
PEDAL PRESSING MECHANISM FOR LOW-SPEED DRIVING IN A ROAD TRAFFIC DELAY |
Leader |
15-JUL-2023 |
14-JUN-2026 |
Sedang Berjalan |
3. |
GREEN SYNTHESIS OF GOLD NANOPARTICLES USING EDIBLE MUSHROOM EXTRACT FOR PASSIVE MODE LOCKED FIBER LASER |
Member |
01-JUN-2022 |
31-MAY-2024 |
Sedang Berjalan |
4. |
REMOTELY HEALTH MONITORING AND REHABILITATION BASED-AI SCHEDULING SYSTEM FOR COVID-19 PATIENT AND ELDERLY |
Leader |
01-DEC-2021 |
30-NOV-2022 |
Selesai (Mencapai Semua KPI) |
5. |
FORMULATION OF FITNESS ADAPTIVE OPPOSITION BASED MULTIOBJECTIVE SPIRAL DYNAMIC ALGORITHMS TO IMPROVE ACCURACY AND DIVERSITY OF PARETO FRONT |
Member |
07-SEP-2021 |
06-SEP-2023 |
Tamat (Perlu hantar laporan akhir) |
6. |
Formulation of new multiobjective exponential and fitness based adaptive Sine-Cosine Algorithm for improving accuracy and convergence speed |
Leader |
01-SEP-2019 |
31-MAY-2023 |
Tamat (Laporan akhir dalam semakan) |
7. |
A NEW NEIGHBORHOOD BASED SPIRAL DYNAMIC ALGORITHM FOR PID CONTROLLER TUNING OF UNDERACTUATED SYSTEMS |
Member |
01-APR-2019 |
30-JUN-2021 |
Selesai (Mencapai Semua KPI) |
8. |
STAIBILIZATION OF TRIPLE LINK INVERTED PENDULUM ON WHEELS SYSTEM USING INTERVAL TYPE-2 FUZZY LOGIC CONTROL |
Leader |
15-MAR-2019 |
14-MAR-2021 |
Selesai (Tidak Mencapai KPI) |
9. |
DEVELOPMENT OF TWO WHEELED STABILIZATION MOBILITY SYSTEM USING INTERVAL TYPE-2 FUZZY LOGIC CONTROL |
Leader |
15-MAR-2019 |
14-MAR-2021 |
Tamat (Perlu hantar laporan akhir) |
10. |
CONTROL OF TRIPLE LINK INVERTED PENDULUM ON TWO-WHEELED SYSTEM USING OPTIMIZED INTERVAL TYPE-2 FUZZY LOGIC CONTROL
|
Leader |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
11. |
DEVELOPMENT OF CONTROLLER FOR AN UNDERACTUATED AUTONOMOUS UNDERWATER VEHICLE (AUV) |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
12. |
NON-INVASIVE ELECTRICAL RESISTANCE TOMOGRAPHY FOR DYNAMIC LIQUID-GAS TWO PHASE FLO |
Member |
01-MAY-2017 |
01-MAY-2019 |
Selesai (Mencapai Semua KPI) |
13. |
Development Of Two Wheeled Stabilization Mobility System Using Fuzzy Logic Control Based Spiral Dynamic Optimization Algorithm |
Leader |
01-MAY-2017 |
31-OCT-2019 |
Selesai (Mencapai Semua KPI) |
14. |
Stabilization Control of Two Wheeled Mobility System for Disabled/Elderly |
Leader |
01-MAR-2017 |
01-MAR-2020 |
Selesai (Mencapai Semua KPI) |
15. |
A Study On Stabilization of A two-Wheeles Mobility System Using Fuzzy Logic Control Based on Nature-Inspired Optimization Algorithm |
Leader |
01-OCT-2015 |
30-SEP-2017 |
Tamat (Tutup Projek) |
16. |
Hybrid Remotely Controlled and Automonous on Heavy Roll Handling Automatic Guided Vehicle for Narrow and Confine Area |
Member |
25-JUN-2015 |
24-JUN-2017 |
Tamat (Tutup Projek) |
17. |
Ultrasonic Transmission-Mode Tomography for Multiphase Flow Regime Identification |
Member |
15-NOV-2010 |
14-NOV-2012 |
Selesai (Mencapai Semua KPI) |
18. |
Study of Optimization Technique for Locomotion Strategies of Multi-legged Mobile Robot |
Member |
15-OCT-2010 |
30-SEP-2013 |
Selesai (Mencapai Semua KPI) |
19. |
Trajectory Tracking LQR Control of Two Wheels Mobile Robot |
Leader |
01-FEB-2010 |
31-JAN-2012 |
Tamat (Perlu hantar laporan akhir) |
20. |
Trajectory Tracking Control Of Two Wheels Mobile Robot |
Leader |
01-OCT-2009 |
30-SEP-2011 |
Tamat (Perlu hantar laporan akhir) |
21. |
Experimental Investigations Of Command Shaping Techniques For Anti-Sway Control Of Double Pendulum Gantry Crane System |
Member |
01-MAY-2009 |
28-FEB-2011 |
Selesai (Mencapai Semua KPI) |
22. |
The Development Of Embedded Input Shaping Techniques For Vibration Control Of Flexible Manipulator System |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
23. |
Development of Universal 3D Stretch Bending Machine (USBM) Control System Using CNC Controller |
Member |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |