NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
OPTIMAL PLANNING OF MICROGRID ISLANDED SYSTEM WITH RENEWABLE ENERGY
DISTRIBUTED GENERATION CONSIDERING UNCERTAINTIES UNDER THE HARSH
ENVIRONMENT IN HORSESHOE ISLAND |
Leader |
01-JAN-2024 |
31-DEC-2026 |
Sedang Berjalan |
2. |
PERFORMANCE INVESTIGATION OF SOLAR PHOTOVOLTAIC MODULES BASED ON VARIOUS AGING PHENOMENON, DEGRADATION ANALYSIS AND PREDICTION |
Member |
01-AUG-2023 |
31-JUL-2025 |
Sedang Berjalan |
3. |
INVESTIGATE THE ELECTRICAL PERFORMANCE OF GRID-CONNECTED PHOTOVOTAIC
SYSTEM USING DIFFERENT DC-LINK PROTECTION TECHNIQUES |
Leader |
15-JUL-2023 |
14-JUN-2026 |
Sedang Berjalan |
4. |
A FORMULATION OF HYBRID MONTE-CARLO SIMULATION AND GREY WOLF OPTIMIZATION FOR OPTIMAL DISTRIBUTED GENERATION PLACEMENT AND NETWORK RECONFIGURATION IN FUTURE SMART GRID DISTRIBUTION NETWORKS |
Member |
01-SEP-2022 |
31-AUG-2025 |
Sedang Berjalan |
5. |
INFLUENCE OF COMPOSTED FOOD WASTE ON PLANT GROWTH ENHANCED WITH MAGNETIC WATER |
Member |
15-JUL-2022 |
14-JUL-2024 |
Sedang Berjalan |
6. |
FORMULATE ZERO-STATE CONTROL ALGORITHM AS A NEW CONVERTER PROTECTION IN LARGE SCALE GRID-CONNECTED PHOTOVOLTAIC SYSTEM |
Leader |
15-JUL-2022 |
14-JUL-2024 |
Sedang Berjalan |
7. |
A NOVEL CENTRALIZED AUTOMATIC ELECTRICAL ENERGY CONTROL & MANAGEMENT SYSTEM WITH EFFICIENCY FORECAST USING DEEP LEARNING |
Leader |
01-JUN-2021 |
31-MAY-2024 |
Sedang Berjalan |
8. |
FORENSICS OF FAULT DETECTION AND DIAGNOSIS IN PV ARRAYS BASED ON ELECTRICAL SIGNATURE ANOMALIES AND STANDARD DEVIATION ANALYSIS
|
Leader |
10-DEC-2020 |
09-DEC-2023 |
Sedang Berjalan |
9. |
MODELING AND OPTIMIZATION OF PVDG BASED ON PROBABILISTIC POWER FLOW EMBEDDED MVMO (PPF_MVMO) CONSIDERING PV GENERATION UNCERTAINTIES IN TROPICAL CLIMATE CONDITIONS AND LOAD VARIATIONS |
Leader |
14-MAR-2019 |
14-MAR-2021 |
Tamat (Perlu hantar laporan akhir) |
10. |
Customer-based Reliability and Penalty Risk Assessment Models by using Monte-Carlo Simulation for Malaysia Future Smart Grid Distribution Network |
Member |
01-JAN-2019 |
30-SEP-2021 |
Selesai (Tidak Mencapai KPI) |
11. |
PERFORMANCE ANALYSIS OF GRID CONNECTED PHOTOVOLTAIC POWER PLANT USING NEW PROTECTION SCHEME IN DC-LINK
|
Leader |
25-SEP-2018 |
24-DEC-2020 |
Tamat (Perlu hantar laporan akhir) |
12. |
ON-SITE CONDITION MONITORING OF PV MODULES ASSISTED BY AERIAL THERMOGRAPHIC IMAGE ANALYSIS |
Member |
20-JUN-2017 |
19-JUN-2019 |
Selesai (Mencapai Semua KPI) |
13. |
Design And Development Of Photovoltaic Power Plant Connected To The Malaysian Electrical Power Grid With Fault Ride-Though Capability |
Leader |
01-MAR-2017 |
01-MAR-2020 |
Tamat (Perlu hantar laporan akhir) |
14. |
A New Control Strategy for Preserving Demand Response in Smart Grid Environment |
Member |
01-AUG-2016 |
31-JUL-2018 |
Selesai (Tidak Mencapai KPI) |
15. |
Study on Fault Ride-Through (FRT) capability as a new requirement in Malaysia grid code for improving power system quality and stability of grid connected photovoltaic system |
Leader |
02-NOV-2015 |
01-NOV-2017 |
Selesai (Mencapai Semua KPI) |
16. |
Development of Active Management of Distribution Testbed with Distributed Generation/Renewable Energy at TNB Research Sdn. Bhd (Bangi) |
Leader |
10-APR-2015 |
09-APR-2016 |
Tamat (Perlu hantar laporan akhir) |
17. |
Design And Implementation Of Industrial Tank's Temperature Control System Using Intelligent Technique |
Member |
01-MAY-2009 |
30-APR-2011 |
Diberhentikan/Ditamatkan |
18. |
A Neuro-Fuzzy Approach For Stator Resistance Estimation Of Induction Motor |
Member |
01-MAY-2009 |
30-DEC-2010 |
Selesai (Tutup Projek) |
19. |
Design and Development Three Phase AC-Induction Motor Control Using V/I Control Algorithm |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
20. |
Study of Silicon Carbide as a New Material in Fabricating Gate Turn Off Thyristor (GTO) |
Leader |
01-OCT-2007 |
30-SEP-2009 |
Selesai (Mencapai Semua KPI) |
21. |
Motorized-Battery Operated Vehicles |
Member |
04-JAN-2007 |
30-SEP-2008 |
Selesai (Mencapai Semua KPI) |
22. |
Design and Development of High Power Density Fuel Cell Interver |
Leader |
01-AUG-2006 |
31-JUL-2007 |
Selesai (Mencapai Semua KPI) |
23. |
Switching Simulation of SIC-GTO |
Leader |
01-AUG-2006 |
31-JUL-2007 |
Selesai (Mencapai Semua KPI) |