NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
DEVELOPMENT OF E-MONITORING SYSTEM FOR SMART FARMING |
Member |
01-JUN-2021 |
31-MAY-2023 |
Sedang Berjalan |
2. |
DEVELOPMENT OF PORTABLE PICO-HYDROKINETIC ENERGY HARNESSING FOR RIVER APPLICATION |
Leader |
23-DEC-2020 |
22-NOV-2022 |
Tamat (Laporan akhir dalam semakan) |
3. |
DEVELOPMENT OF CUPPING MACHINE WITH AUTOMATIC SUCTION CONTROL |
Member |
23-DEC-2020 |
22-NOV-2022 |
Tamat (Laporan akhir dalam semakan) |
4. |
EVALUATION OF DATA CAPTURING FOR LLLS (LOCALISED LIGHTNING LOCATING SYSTEM) IN FTKEE UMP PEKAN PAHANG |
Member |
17-DEC-2020 |
16-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
5. |
Comparative Analysis of High-Speed Lightning Photographic Recorder From Pekan, Pahang with Broadband Interferometer Antenna System |
Member |
01-NOV-2019 |
31-OCT-2021 |
Tamat (Perlu hantar laporan akhir) |
6. |
CHARACTERISTIC OF ELECTRICAL SIGNAL OF TRANSIENT LUMINOUS EVENTS (TLES)IN PEKAN PAHANG |
Member |
01-MAY-2017 |
01-MAY-2019 |
Selesai (Tidak Mencapai KPI) |
7. |
A New Control Strategy for Preserving Demand Response in Smart Grid Environment |
Member |
01-AUG-2016 |
31-JUL-2018 |
Selesai (Tidak Mencapai KPI) |
8. |
Intelligent Energy Management System of Series Hybrid Electric Vehicle (HEV) |
Member |
25-JUN-2016 |
24-JUN-2018 |
Selesai (Tutup Projek) |
9. |
New Design of High Efficiency LED Lighting System |
Member |
15-DEC-2012 |
14-DEC-2014 |
Selesai (Mencapai Semua KPI) |
10. |
The Development Of Load Frequency Controller For The Efficiency In Power System |
Member |
01-JUN-2012 |
31-MAY-2014 |
Tamat (Perlu hantar laporan akhir) |
11. |
Development of Lightning Localized System (LLS) for Pekan District |
Leader |
15-NOV-2010 |
14-NOV-2012 |
Selesai (Mencapai Semua KPI) |