NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
ELUCIDATION OF POZZOLANIC REACTION KINETICS OF FLY ASH BLENDED MORTAR MIX WITH COCKLE SHELL POWDER FOR 3D MORTAR PRINTING |
Leader |
01-AUG-2024 |
31-JUL-2026 |
Sedang Berjalan |
2. |
SMART LAB MANAGEMENT SYSTEM (SLAMS) |
Member |
29-JAN-2024 |
30-NOV-2024 |
Sedang Berjalan |
3. |
INVESTIGATION OF EFFECT OF PRINT PARAMETERS ON MATERIAL BEHAVIORS OF 3D PRINTED CONCRETE |
Member |
15-SEP-2023 |
14-SEP-2025 |
Sedang Berjalan |
4. |
FORMULATION OF CEMENTITIOUS MATERIALS COMPOSITION FOR 3D CONCRETE PRINT |
Leader |
01-JUL-2023 |
30-JUN-2025 |
Sedang Berjalan |
5. |
PROPERTIES OF PALM OIL WASTE BLENDED CEMENT BASED CONCRETE CONTAINING SPENT GARNET WASTE AS PARTIAL FINE AGGREGATE REPLACEMENT |
Member |
01-MAY-2022 |
30-APR-2024 |
Sedang Berjalan |
6. |
DEVELOPMENT OF PRECAST LIGHTWEIGHT CONCRETE FENCING WALL PANEL CONTAINING INDUSTRIAL WASTE |
Member |
01-DEC-2021 |
30-NOV-2023 |
Sedang Berjalan |
7. |
NUMERICAL MODELLING OF BLAST LOADED THIN STEEL PLATES SUBJECTED TO FIRE LOADING |
Leader |
23-DEC-2020 |
22-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
8. |
THE TRANSIENT RESPONSE OF MILD STEEL PLATES SUBJECTED TO CLOSE-IN BLAST LOADS |
Leader |
10-DEC-2020 |
09-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
9. |
UNPROPPED LONG SPAN MODIFIED COMPOSITE SLABS |
Member |
15-DEC-2018 |
14-MAR-2021 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
10. |
Propose High Strength Concrete using Natural Agricultural Waste Materials |
Member |
15-JUN-2013 |
14-JUN-2015 |
Tamat (Tutup Projek) |
11. |
Teams that Teach and Learn using Steered Module (Telus Mod): Study of the Learning Effects in Guided Students Study Group |
Member |
15-DEC-2012 |
14-DEC-2015 |
Tamat (Tutup Projek) |
12. |
Pan System as Permanent Formwork for Upper Floor Slabs |
Member |
01-AUG-2012 |
31-JUL-2014 |
Selesai (Mencapai Semua KPI) |
13. |
Low cost Integrated Oil Palm Waste (I-OPA) Filters Media For Wastewater Treatment. Cluster: Sustainable Water and Wastewater Treatment and Reuse |
Member |
01-JUL-2011 |
01-JAN-2013 |
Selesai (Mencapai Semua KPI) |