NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
Transfer Of Waste Recycling Knowledge For Empowerment Of Sustainable Development Goals Principles Among Secondary School Students For Better Future Generation |
Member |
15-OCT-2024 |
14-OCT-2025 |
Sedang Berjalan |
2. |
ELUCIDATION OF CHLORIDE INGRESS MECHANISM IN PURE BENDING SECTION OF REINFORCED CONCRETE BEAM UNDER THE COMBINED EFFECT OF CRACKS AND LOADS |
Leader |
01-SEP-2022 |
31-AUG-2024 |
Sedang Berjalan |
3. |
THE APPLICATION OF GREEN ROOF WITH RECYCLED WASTE MATERIALS TO ENHANCE URBAN STORMWATER QUANTITY AND QUALITY |
Member |
25-APR-2021 |
24-APR-2023 |
Tamat (Perlu hantar laporan akhir) |
4. |
PREDICTION MODEL OF CORROSION INITIATION DETECTION FOR SUSTAINABLE BRIDGE ASSESSMENT |
Leader |
15-DEC-2020 |
14-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
5. |
Surface Modification Of Activated Carbon From Rice Husk For CO2 Capture
|
Member |
01-JUL-2014 |
30-JUN-2016 |
Tamat (Tutup Projek) |
6. |
Surface Modification Of Activated Carbon From Rice Husk For CO2 Capture
|
Member |
01-JUL-2014 |
30-JUN-2016 |
Tamat (Tutup Projek) |
7. |
Propose High Strength Concrete using Natural Agricultural Waste Materials |
Member |
15-JUN-2013 |
14-JUN-2015 |
Tamat (Tutup Projek) |
8. |
Teams that Teach and Learn using Steered Module (Telus Mod): Study of the Learning Effects in Guided Students Study Group |
Member |
15-DEC-2012 |
14-DEC-2015 |
Tamat (Tutup Projek) |
9. |
Fibres a Part of Shear Reinforcement in Reinforced Concrete Beams |
Member |
15-DEC-2012 |
14-DEC-2015 |
Selesai (Mencapai Sebahagian KPI) |
10. |
The Potential of Cooling Effect in Green Roofs using Palm of Clinker as Drainage Layer Under Malaysia Climatic Conditions |
Leader |
15-DEC-2012 |
14-DEC-2014 |
Selesai (Mencapai Semua KPI) |
11. |
Alkali Activation of Palm Oil Industry Waste for High Calcium Fly Ash Based Geopolymer Concrete |
Member |
15-JUL-2012 |
14-JUN-2014 |
Selesai (Mencapai Semua KPI) |
12. |
Application of Nanotechnology, Natural Additive and Steel Fibre in Concrete Enhancement |
Member |
01-SEP-2011 |
31-DEC-2012 |
Selesai (Mencapai Semua KPI) |