ACADEMIC STAFF
+  Fakulti Teknologi Kejuruteraan Kimia Dan Proses (103)
+  Fakulti Teknologi Kejuruteraan Awam (81)
+  Fakulti Teknologi Kejuruteraan Elektrik Dan Elektronik (94)
+  Fakulti Komputeran (80)
+  Fakulti Teknologi Kejuruteraan Mekanikal Dan Automotif (89)
+  Fakulti Sains Dan Teknologi Industri (75)
+  Fakulti Teknologi Kejuruteraan Pembuatan Dan Mekatronik (64)
+  Fakulti Pengurusan Industri (48)
+  Pusat Bahasa Moden (58)
 

Search by Name Expertise

Home> FTKA1000-FAKULTI TEKNOLOGI KEJURUTERAAN AWAM

PUAN NOOR ASIAH BINTI MOHAMAD

Contact No. : 095492559
Gender : FEMALE
Nationality : MALAYSIA
Current Positon : DS45-A-PENSYARAH UNIVERSITI
E-Mail : noorasiah@ump.edu.my
 
ACADEMIC QUALIFICATION
. 2010 : IJAZAH SARJANA (MASTERS DEGREE), UNIVERSITI TEKNOLOGI MALAYSIA (SKUDAI)
. 2007 : IJAZAH SARJANA MUDA (BACHELOR DEGREE), UNIVERSITI TEKNOLOGI PETRONAS (UTP)
 
EXPERTISE
EXPERT AREA MAJOR YEARS OF EXPERTISE LEVEL
WATER RESOURCES COASTAL ENGINGEERING
4
SEDERHANA
 
EMPLOYMENT HISTORY
EMPLOYER POST JOIN DATE RESIGN DATE STATUS
Dr. Nik & Associates JURUTERA 14/01/2008 31/12/2008 TETAP
Coastal And Offshore Engineering Institute, Universiti Teknologi Malaysia PEGAWAI PENYELIDIK 20/12/2010 21/06/2011 KONTRAK
Institut Penyelidikan Hidraulik Kebangsaan Malaysia PEGAWAI PENYELIDIK 01/07/2011 06/12/2012 TETAP
   
RESEARCH
NO. TITLE ROLE START DATE END DATE STATUS
1. Development of Construction Quality Assessment (CQA) Mobile Application Member 27-DEC-2019 26-MAR-2022 Tamat (Perlu hantar laporan akhir)
2. Formulation of Accessibility in Malaysian Housing based on Universal Design Concept Member 01-SEP-2019 31-MAY-2022 Selesai (Tidak Mencapai KPI)
3. DEVELOPMENT OF CONSTRUCTION QUALITY ASSESSMENT (CQA)MOBILE APPLICATION Member 05-APR-2018 04-JUL-2020 Selesai (Mencapai Sebahagian KPI)
4. Improving Pedestrian Infrastructure in Kuantan City Member 25-AUG-2017 24-AUG-2019 Tamat (Laporan akhir dalam semakan)
5. Construction Quality Assessment (CQA) Mobile Application Member 10-JUL-2017 09-JUL-2018 Diberhentikan/Ditamatkan
6. Design of Sensorless Brushless Direct Current Hub Motor Half-Bridge Driver Circuit for Electric Vehicle Member 25-JUN-2015 24-JUN-2017 Selesai (Tutup Projek)
7. Determining Potential Rainwater harvesting Sites using Satellite Images and Geographic Information System Leader 25-NOV-2014 24-NOV-2016 Selesai (Tutup Projek)
8. Hybrid Techno-Economic Forecasting Model of Renewable Energy System at Pekan Coastal Area Member 01-JUN-2014 31-MAY-2016 Selesai (Tutup Projek)
   
PUBLICATION
TYPE PUBLICATION TARIKH PENERBITAN TYPE OF CONTRIBUTION
REFEREED PUBLICATION
CONFERENCE PAPER Stabilisation Analysis Of Slope On Bauxite Mining Area 16/02/2016 70%
   

For best view, please use Mozilla Firefox, Internet Explorer 7.0 or above with resolution 1024 x 768 pixel.

Copyright 2011 Universiti Malaysia Pahang