NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
KAJIAN GEOTEKNIK BAGI PENGESAHAN KESTABILAN TANAH DAN PENILAIAN RISIKO TANAH RUNTUH DI TAMAN PERUMAHAN GAMBANG DAMAI |
Member |
08-FEB-2024 |
08-AUG-2024 |
Tamat (Perlu hantar laporan akhir) |
2. |
SEISMIC VULNERABILITY OF RESIDENTIAL BUILDINGS IN LOW-TOMODERATE SEISMIC REGION (UIC231506)
|
Member |
01-AUG-2023 |
31-JUL-2024 |
Tamat (Perlu hantar laporan akhir) |
3. |
SEISMIC VULNERABILITY OF RESIDENTIAL BUILDINGS IN LOW-TO-MODERATE SEISMIC REGION (RDU232703) |
Member |
01-AUG-2023 |
31-JUL-2024 |
Tamat (Perlu hantar laporan akhir) |
4. |
STRUCTURAL PERFORMANCE AND FRAGILITY CURVE OF TALL BUILDING UNDER EARTHQUAKE EXCITATION |
Leader |
01-JUL-2023 |
30-JUN-2025 |
Sedang Berjalan |
5. |
EVALUATION OF THE FRESH PROPERTIES, MECHANICAL
PROPERTIES, AND MICROSTRUCTURE BEHAVIOR INCORPORATING
ALUM SLUDGE AND COAL BOTTOM ASH (ASBA) AS A PARTIAL
CEMENT SUBSTITUTE IN SELF-COMPACTING CONCRETE |
Member |
15-DEC-2022 |
14-DEC-2024 |
Sedang Berjalan |
6. |
DEVELOPMENT OF PRECAST LIGHTWEIGHT CONCRETE FENCING WALL PANEL CONTAINING INDUSTRIAL WASTE |
Member |
01-DEC-2021 |
30-NOV-2023 |
Sedang Berjalan |
7. |
Physio-Mechanical and Durability Analysis of Lightweight Concrete Containing Construction Waste As Mixing Ingredient |
Member |
01-SEP-2021 |
31-AUG-2023 |
Tamat (Perlu hantar laporan akhir) |
8. |
EVALUATION OF ECONOMICAL ASPECTS TO IMPLEMENT SEISMIC DESIGN FOR NEW REINFORCED CONCRETE BUILDINGS IN MALAYSIA |
Member |
25-APR-2021 |
24-APR-2023 |
Selesai (Mencapai Semua KPI) |
9. |
Investigating the Root Causes of Effective Enforcement of the Erosion and Sediment Control Plan in Construction Projects |
Leader |
01-NOV-2019 |
31-JAN-2022 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
10. |
Structural Vulnerability and Risk Analysis of Offshore Structure |
Leader |
01-NOV-2019 |
31-OCT-2021 |
Selesai (Mencapai Sebahagian KPI) |
11. |
Degradation Modelling for Composite Repaired Pipe |
Member |
01-OCT-2019 |
31-DEC-2021 |
Tamat (Perlu hantar laporan akhir) |
12. |
The assessment on the acceptance of waste materials as a cement replacement in Malaysian construction industry |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Mencapai Semua KPI) |
13. |
EVALUATION ON THE MECHANICAL AND DURABILITY PROPERTIES OF CONCRETE CONTAINING INDUSTRIAL WASTE GARNET AS PARTIAL FINE AGGREGATE REPLACEMENT |
Member |
10-MAY-2019 |
09-AUG-2021 |
Selesai (Mencapai Semua KPI) |
14. |
Kencrete: Green materials for building structures |
Member |
05-DEC-2018 |
04-MAR-2021 |
Tamat (Perlu hantar laporan akhir) |
15. |
BEHAVIOUR OF HYBRID (STEEL AND KENAF) FIBERS IN REINFORCED CONCRETE BEAM WITH OPENING CONDITIONS |
Member |
25-NOV-2018 |
24-FEB-2021 |
Selesai (Mencapai Sebahagian KPI) |
16. |
Investigation on The Materials Characteristic, Mix Design, Fresh and Hardened Properties of Lightweight Concrete Using Coal Bottom Ash |
Member |
01-OCT-2018 |
30-DEC-2020 |
Selesai (Mencapai Sebahagian KPI) |
17. |
NUMERICAL SIMULATION ON PROBABILITIES SEISMIC HAZARD ASSESSMENT AND VULNERABILITY STUDY ON EXISTING STRUCTURE IN MALAYSIA |
Leader |
30-JUN-2017 |
29-JUN-2019 |
Selesai (Mencapai Sebahagian KPI) |
18. |
Estimation model of weight of steel in reinforced concrete building with seismic design in Malaysia |
Member |
30-JUN-2017 |
29-JUN-2019 |
Selesai (Mencapai Semua KPI) |
19. |
PROPERTIES OF PALM OIL CLINKER LIGHTWEIGHT AGGREGATE CONCRETE FOR LOAD BEARING STRUCTURAL APPLICATION |
Member |
15-JUN-2017 |
14-JUN-2019 |
Tamat (Perlu hantar laporan akhir) |
20. |
ECO FRIENDLY CEMENT SAND BRICK CONTAINING WASTE PAPER AND COAL BOTTOM ASH AS MIXING INGREDIE |
Member |
15-MAY-2017 |
14-MAY-2019 |
Selesai (Mencapai Semua KPI) |
21. |
PROPERTIES OF FOAMED CONCRETE CONTAINING PALM OIL FUEL ASH |
Member |
25-MAY-2016 |
24-MAY-2017 |
Tamat (Tutup Projek) |
22. |
Earthquake Resistance and Structure Performance for Malaysia Region |
Leader |
01-DEC-2014 |
30-NOV-2016 |
Tamat (Tutup Projek) |
23. |
Behaviour of Fibre Reinforced Concrete in Structural Element |
Member |
25-NOV-2014 |
24-NOV-2016 |
Selesai (Mencapai Sebahagian KPI) |