NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
INVESTIGATING THE CHARACTERISTICS OF HYBRID ASPHALT BINDER AND MIXTURE FOR IMPROVED PAVEMENT PERFORMANCE |
Member |
01-SEP-2024 |
31-AUG-2026 |
Sedang Berjalan |
2. |
Investigation the Influence of Sediment Composition on Nutrient Dynamics, Algal Blooms, and Dissolved Oxygen in Lake Ecosystems |
Member |
01-APR-2024 |
31-MAR-2026 |
Sedang Berjalan |
3. |
KAJIAN LALULINTAS DI DAERAH CAMERON HIGHLANDS |
Member |
01-JAN-2024 |
30-SEP-2024 |
Sedang Berjalan |
4. |
THE ASSESSMENT OF A NEW CLASS ULTRA-RAPID HARDENING HYDRAULIC CEMENTS |
Member |
01-DEC-2023 |
30-NOV-2025 |
Sedang Berjalan |
5. |
THE INNOVATIVE INTEGRATED MODEL SYSTEM DEVELOPMENT FOR THE IMPLEMENTATION OF COMPLEX, BROADLY DEFINED AND WELL-DEFINED ENGINEERING PROBLEMS FOR CIVIL ENGINEERING RELATED PROGRAMMES |
Leader |
01-DEC-2023 |
30-NOV-2025 |
Sedang Berjalan |
6. |
MICROSTRUCTURE INTERACTION MECHANISM ON BLENDING PROCESS OF NANOMATERIAL WITH ASPHALT BINDER THAT GOVERNS THE MORPHOLOGY, RHEOLOGY, AND MECHANICAL PROPERTIES OF NANOMODIFIED COLD MIX ASPHALT MIXTURE� |
Leader |
01-OCT-2023 |
30-SEP-2025 |
Sedang Berjalan |
7. |
Formulation of physical and mechanical characteristics of asphalt mixtures incorporating tin tailing and iron |
Leader |
15-AUG-2023 |
14-AUG-2025 |
Sedang Berjalan |
8. |
THE ASSESSMENT OF NANO-MODIFIED STONE MASTIC ASPHALT WITH VARIOUS EXTERNAL
LOADS SUCH AS TRAFFIC AND BLAST LOADS |
Leader |
15-JUL-2023 |
14-JUN-2026 |
Sedang Berjalan |
9. |
NEAR MISS CRASH AT INTERSECTION |
Leader |
15-JUL-2023 |
14-JUN-2026 |
Sedang Berjalan |
10. |
PILOT STUDY OF COLD MIX ASPHALT (UIC230805) |
Leader |
15-JUN-2023 |
14-DEC-2023 |
Ditangguhkan |
11. |
PILOT STUDY OF COLD MIX ASPHALT (RDU232403) |
Leader |
01-MAR-2023 |
14-DEC-2023 |
Ditangguhkan |
12. |
FORMULATION OF INTERACTION MECHANISM OF VERMICOMPOST WITH GYPSUM ON BAUXITE AGGREGATE STABILITY AND LIQUEFACTION RISK |
Member |
15-OCT-2022 |
14-OCT-2024 |
Sedang Berjalan |
13. |
KAJIAN LALULINTAS DAN PENGANGKUTAN AWAM BANDARAYA KUANTAN |
Member |
15-MAR-2022 |
14-MAR-2023 |
Tamat (Perlu hantar laporan akhir) |
14. |
A STUDY ON COMPETITION ISSUES IN HIGHWAY CONSTRUTION INDUSTRY DUE TO COVID-19 OUTBREAK |
Leader |
01-JUN-2021 |
31-MAY-2024 |
Tamat (Perlu hantar laporan akhir) |
15. |
DEVELOPMENT OF BLAST LOAD DEVICE TO MEASURE THE PRESSURE FOR FLEXIBLE PAVEMENT |
Member |
01-JUN-2021 |
31-MAY-2023 |
Tamat (Perlu hantar laporan akhir) |
16. |
MECHANICAL PERFORMANCE OF CONCRETE BLOCK PAVEMENT UNDER VARIOUS EXTERNAL LOADS |
Leader |
01-JUN-2021 |
31-MAY-2024 |
Tamat (Perlu hantar laporan akhir) |
17. |
ELUCIDATION OF HYDRAULIC BEHAVIOR FOR FIBER-REINFORCED POROUS ASPHALT PAVEMENT |
Member |
26-FEB-2021 |
25-FEB-2023 |
Selesai (Mencapai Semua KPI) |
18. |
A DYNAMIC ROAD PRICING MODEL TO REDUCE HIGHWAY CONGESTION IN MALAYSIA |
Member |
20-DEC-2020 |
19-DEC-2022 |
Selesai (Mencapai Semua KPI) |
19. |
PHYSICAL PROPERTIES AND CHEMICAL CHARACTERISATION OF NANOTITANIUM MODIFIED ASPHALT BINDER
|
Leader |
10-DEC-2020 |
09-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
20. |
HYDRAULIC AND MECHANICAL CHARACTERISTICS OF FIBER REINFORCED POROUS ASPHALT MIXTURE |
Leader |
10-DEC-2020 |
09-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
21. |
PERFORMANCE EVALUATION OF ASPHALT MIXTURE USING IMAGE ANALYSIS APPROACH
|
Leader |
10-DEC-2020 |
09-DEC-2022 |
Tamat (Perlu hantar laporan akhir) |
22. |
DEVELOPMENT OF HIGH DURABILITY ASPHALT BLOCK PAVEMENT |
Leader |
01-NOV-2020 |
31-OCT-2022 |
Selesai (Mencapai Sebahagian KPI) |
23. |
ASSESSING PERMANENT DEFORMATION OF TWO-LAYER POROUS ASPHALT (TLPA) INCORPORATING NANO-HYBRID KENAF FIBER |
Leader |
26-JUN-2020 |
25-JUN-2022 |
Tamat (Perlu hantar laporan akhir) |
24. |
Development of IoT Geotechnical Data Mapping System for Pahang UIC201503 |
Member |
01-JAN-2020 |
31-MAR-2022 |
Selesai (Mencapai Semua KPI) |
25. |
ASSESSING MECHANICAL PROPERTIES OF FLEXIBLE PAVEMENT UNDER TRAFFIC AND BLAST LOADS |
Member |
30-DEC-2019 |
29-MAR-2022 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
26. |
MODELLING DOUBLE LAYER POROUS ASPHALT MIXTURE INCORPORATING VARIOUS TYPE OF NATURAL FIBERS |
Leader |
01-NOV-2019 |
31-JAN-2022 |
Selesai (Mencapai Semua KPI) |
27. |
Microstructure interaction mechanism of asphalt binder incorporating natural fibers |
Leader |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Mencapai Semua KPI) |
28. |
FORMULATION OF MODEL TO ASSESS THE FAILURE OF ROCK SLOPE |
Member |
01-MAY-2019 |
30-JUL-2021 |
Selesai (Tidak Mencapai KPI) |
29. |
GEOTECHNICAL CHARACTERISATION OF BAUXITE DEPOSITS IN THE KUANTAN FOR CIVIL ENGINEERING WORK PURPOSES |
Member |
25-OCT-2018 |
24-JAN-2021 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
30. |
PERFORMANCE OF WASTE COOKING OIL AS BITUMEN MODIFIER |
Member |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
31. |
ASSESSMENT OF NANOSILICA CONCENTRATIONS TOWARDS THE MICROSTRUCTURAL CHANGES OF NANOSILICA MODIFIED ASPHALT BINDER |
Leader |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
32. |
STUDY OF PERMANENT STABILIZATION PROJECT FOR ROCK SLOPE AT JELAPANG,KM 258.17.SOUTH BOUND, SECTION N5(IPOH) AND BUKIT LANJAN, SECTION C4 AND SITE INVESTIGATION PROJECT USING ELECTRICAL RESISTIVITY SURVEY AT JABATAN TAMAN LAUT MALAYSIA,PULAU AUR MERSING JOHOR |
Member |
18-JUL-2018 |
17-JUN-2019 |
Diberhentikan/Ditamatkan |
33. |
Performance-Based Contract (PBC) for road maintenance in Malaysia |
Member |
30-JUN-2017 |
29-JUN-2019 |
Tamat (Laporan akhir dalam semakan) |