NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
LOCATING THE SOURCE ROCK IN MINERAL EXPLORATION USING ELECTRICAL RESISTIVITY IMAGING |
Leader |
01-FEB-2024 |
31-JAN-2025 |
Sedang Berjalan |
2. |
CHARACTERISATION OF DEBRIS FLOW MATERIAL |
Leader |
01-SEP-2022 |
31-AUG-2025 |
Sedang Berjalan |
3. |
DEVELOPING AN INTEGRATED ROCK SLOPE ASSESSMENT FOR GRANITIC ROCK
|
Leader |
10-DEC-2020 |
09-DEC-2023 |
Tamat (Perlu hantar laporan akhir) |
4. |
MODELLING DOUBLE LAYER POROUS ASPHALT MIXTURE INCORPORATING VARIOUS TYPE OF NATURAL FIBERS |
Member |
01-NOV-2019 |
31-JAN-2022 |
Selesai (Mencapai Semua KPI) |
5. |
FORMULATION OF MODEL TO ASSESS THE FAILURE OF ROCK SLOPE |
Member |
01-MAY-2019 |
30-JUL-2021 |
Selesai (Tidak Mencapai KPI) |
6. |
GEOTECHNICAL CHARACTERISATION OF BAUXITE DEPOSITS IN THE KUANTAN FOR CIVIL ENGINEERING WORK PURPOSES |
Leader |
25-OCT-2018 |
24-JAN-2021 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
7. |
PERFORMANCE OF WASTE COOKING OIL AS BITUMEN MODIFIER |
Member |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
8. |
ASSESSMENT OF NANOSILICA CONCENTRATIONS TOWARDS THE MICROSTRUCTURAL CHANGES OF NANOSILICA MODIFIED ASPHALT BINDER |
Member |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
9. |
STUDY OF PERMANENT STABILIZATION PROJECT FOR ROCK SLOPE AT JELAPANG,KM 258.17.SOUTH BOUND, SECTION N5(IPOH) AND BUKIT LANJAN, SECTION C4 AND SITE INVESTIGATION PROJECT USING ELECTRICAL RESISTIVITY SURVEY AT JABATAN TAMAN LAUT MALAYSIA,PULAU AUR MERSING JOHOR |
Leader |
18-JUL-2018 |
17-JUN-2019 |
Diberhentikan/Ditamatkan |