ACADEMIC STAFF
+  Fakulti Teknologi Kejuruteraan Kimia Dan Proses (103)
+  Fakulti Teknologi Kejuruteraan Awam (80)
+  Fakulti Teknologi Kejuruteraan Elektrik Dan Elektronik (94)
+  Fakulti Komputeran (81)
+  Fakulti Teknologi Kejuruteraan Mekanikal Dan Automotif (87)
+  Fakulti Sains Dan Teknologi Industri (78)
+  Fakulti Teknologi Kejuruteraan Pembuatan Dan Mekatronik (63)
+  Fakulti Pengurusan Industri (51)
+  Pusat Bahasa Moden (57)
 

Search by Name Expertise

Home> FTKA1000-FAKULTI TEKNOLOGI KEJURUTERAAN AWAM

DR. LEE YONG SIANG

Contact No. : -
Gender : MALE
Nationality : MALAYSIA
Current Positon : DS51-A-PENSYARAH UNIVERSITI
E-Mail : leeys@ump.edu.my
 
ACADEMIC QUALIFICATION
. 2020 : IJAZAH KEDOKTORAN (DOCTORAL DEGREE), UNIVERSITI SAINS MALAYSIA
. 2013 : IJAZAH SARJANA MUDA (BACHELOR DEGREE), UNIVERSITI MALAYSIA SARAWAK
 
EXPERTISE
EXPERT AREA MAJOR YEARS OF EXPERTISE LEVEL
CIVIL ENGINEERING ENGINEERING MANAGEMENT
9
SANGAT TINGGI
 
EMPLOYMENT HISTORY
EMPLOYER POST JOIN DATE RESIGN DATE STATUS
Kerjaya Prospek (M) Sdn Bhd PROJECT MANAGER 01/06/2019 01/06/2020 TETAP
Universiti Tunku Abdul Rahman ASSISTANT PROFESSOR 01/10/2020 01/10/2021 TETAP
   
RESEARCH
NO. TITLE ROLE START DATE END DATE STATUS
1. RENEWABLE ENERGY PROJECT EVALUATION IN MALAYSIA AND OMAN: A DECISION-MAKING TRIAL AND EVALUATION LABORATORY (DEMATEL) BASED FRAMEWORK (RDU242747) Member 01-OCT-2024 30-SEP-2025 Sedang Berjalan
2. RENEWABLE ENERGY PROJECT EVALUATION IN MALAYSIA AND OMAN: A DECISION-MAKING TRIAL AND EVALUATION LABORATORY (DEMATEL) BASED FRAMEWORK (UIC241549) Member 01-OCT-2024 30-SEP-2025 Sedang Berjalan
3. A NOVEL BIM-BASED CIRCULAR INFRASTRUCTURE LIFECYCLE FRAMEWORK USING R-PRINCIPLES TO ENSURE SUSTAINABLE CONSTRUCTION IN MALAYSIA Leader 01-AUG-2024 31-JUL-2026 Sedang Berjalan
4. SAFETY AND HEALTH FACTORS FOR CONSTRUCTION SITES OF HIGH-RISE BUILDING PROJECT IN MALAYSIA Leader 15-JUL-2023 14-JUN-2026 Sedang Berjalan
5. THE DEVELOPMENT TRADE-LEVEL PRODUCTIVITY MEASURING TOOL FOR BUILDING CONSTRUCTION PROJECTS Member 01-JAN-2023 30-JUN-2023 Tamat (Perlu hantar laporan akhir)
6. FORMULATING AN INTERRELATIONSHIP MODEL OF DIGITAL LEADERSHIP FACTORS AND STRATEGIES IN BUILT ENVIRONMENT Member 25-DEC-2022 24-DEC-2024 Sedang Berjalan
7. PRIORITY IMPORTANCE OF SOCIAL CIRCULAR ECONOMY INDICATORS FOR INFRASTRUCTURE CONSTRUCTION PROJECTS Leader 25-DEC-2022 24-DEC-2024 Sedang Berjalan
8. FORMULATING A DECISION MODEL OF TRUST AMONG THE PARTIES IN DIGITAL CONSTRUCTION Member 25-DEC-2022 24-DEC-2024 Sedang Berjalan
9. FORMULATING AN INTERRELATIONSHIP MODEL OF DIGITAL TWIN READINESS CRITERIA FOR BIM-BASED CONSTRUCTION PROJECTS Member 25-DEC-2022 24-DEC-2024 Sedang Berjalan
10. DEVELOPMENT OF FLOOD VULNERABILITY INDEX (FVI) USING ANALYTICAL HIERARCHY PROCESS (AHP) FOR KUANTAN RIVER BASIN, MALAYSIA Member 15-DEC-2022 14-DEC-2024 Sedang Berjalan
11. FROM BIM TO DIGITAL TWINS: ASSESSMENT OF ORGANIZATIONAL READINESS Member 15-DEC-2022 14-DEC-2024 Sedang Berjalan
12. FORMULATING AN EFFECTIVE RISK COMMUNICATION MODEL FOR LARGE-SCALE UNDERGROUND INFRASTRUCTURE PROJECTS Leader 15-JUL-2022 14-JUL-2024 Tamat (Laporan akhir dalam semakan)
13. KAJIAN TERHADAP TAHAP PENGGUNAAN BUILDING INFORMATION MODELLING (BIM) DALAM INDUSTRI PEMBINAAN 2021 Member 17-JUN-2022 16-JAN-2023 Tamat (Laporan akhir dalam semakan)
   
PUBLICATION
No Record.

   

For best view, please use Mozilla Firefox, Internet Explorer 7.0 or above with resolution 1024 x 768 pixel.

Copyright 2011 Universiti Malaysia Pahang