NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
PROJEK KHAS UMP SMART FLOOD WARNING SYSTEM
|
Member |
14-SEP-2022 |
13-SEP-2024 |
Tamat (Perlu hantar laporan akhir) |
2. |
KAJIAN BAGI CADANGAN MENAIKTARAF INFRASTRUKTUR BAGI MENGURANGKAN BANJIR DI KELAT RENDANG, PEKAN |
Member |
15-JUN-2022 |
14-JUN-2023 |
Selesai (Mencapai Semua KPI) |
3. |
FORMULATION OF WIND STORM RISK ASSESSMENT MODEL FOR BUILDING DAMAGES IN NORTHERN PENINSULAR MALAYSIA |
Leader |
07-SEP-2021 |
06-SEP-2024 |
Sedang Berjalan |
4. |
MULTICRITERIA DECISION MODEL TO EVALUATE PROJECT EXECUTION RISK RATING FOR ROAD CONSTRUCTION PROJECT |
Member |
01-SEP-2021 |
31-AUG-2023 |
Tamat (Perlu hantar laporan akhir) |
5. |
The analysis of mitigation plan driver for abandoned housing project in Malaysia by using logistic regression and analytical hierarchy process |
Member |
01-NOV-2019 |
31-JAN-2022 |
Selesai (Mencapai Semua KPI) |
6. |
THE INFLUENCE OF BLACK RICE HUSK ASH BLENDED CEMENT CONCRETE UNDER CHLORIDE AND SULPHATE ATTACK |
Leader |
10-MAY-2019 |
09-AUG-2021 |
Selesai (Mencapai Sebahagian KPI) |
7. |
GEOTECHNICAL CHARACTERISATION OF BAUXITE DEPOSITS IN THE KUANTAN FOR CIVIL ENGINEERING WORK PURPOSES |
Member |
25-OCT-2018 |
24-JAN-2021 |
Tamat (Laporan akhir dikembalikan dan perlu dihantar semula) |
8. |
PERFORMANCE OF WASTE COOKING OIL AS BITUMEN MODIFIER |
Member |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
9. |
ASSESSMENT OF NANOSILICA CONCENTRATIONS TOWARDS THE MICROSTRUCTURAL CHANGES OF NANOSILICA MODIFIED ASPHALT BINDER |
Member |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Semua KPI) |
10. |
STUDY OF PERMANENT STABILIZATION PROJECT FOR ROCK SLOPE AT JELAPANG,KM 258.17.SOUTH BOUND, SECTION N5(IPOH) AND BUKIT LANJAN, SECTION C4 AND SITE INVESTIGATION PROJECT USING ELECTRICAL RESISTIVITY SURVEY AT JABATAN TAMAN LAUT MALAYSIA,PULAU AUR MERSING JOHOR |
Member |
18-JUL-2018 |
17-JUN-2019 |
Diberhentikan/Ditamatkan |
11. |
KAJIAN STATUS HASILAN DAN KUALITI AIR NEGERI PAHANG DARUL MAKMUR |
Leader |
01-JUL-2018 |
30-JUN-2019 |
Tamat (Perlu hantar laporan akhir) |
12. |
Spatial Analytic Model for Wind Hazard Assessment : An Integrated Approach |
Leader |
01-JUN-2018 |
30-JUN-2019 |
Tamat (Tutup Projek) |
13. |
Estimation model of weight of steel in reinforced concrete building with seismic design in Malaysia |
Member |
30-JUN-2017 |
29-JUN-2019 |
Selesai (Mencapai Semua KPI) |
14. |
INVESTIGATION OF ABANDONED BUILDING IN MALAYSIA - CAUSE AND EFFECT TO THE SOCIAL, ECONOMY AND SAFETY |
Member |
01-APR-2017 |
01-APR-2019 |
Selesai (Mencapai Semua KPI) |
15. |
INTEGRATING SUSTAINABLE MANAGEMENT FOR GEBENG INDUSTRIAL ESTATE |
Member |
01-APR-2017 |
01-APR-2019 |
Selesai (Mencapai Semua KPI) |
16. |
KAJIAN PENYEDIAAN PELAN PENGURUSAN LEMABANGAN SUNGAI BERSEPADU (IRBM), SUNGAI KUANTAN, PAHANG DI BAWAH PERLAKSANAAN JPS MALAYSIA |
Member |
14-FEB-2017 |
31-DEC-2018 |
Tamat (Tutup Projek) |
17. |
Numerical Modelling of Environment Friendly Adobe Structural Systems |
Member |
25-MAY-2016 |
24-MAY-2018 |
Tamat (Tutup Projek) |
18. |
Kajian Kejadian Banjir Kampung Bukit Rangin Daerah Kuantan Pahang Darul Makmur (Disember 2001, 2013 dan 2014) |
Member |
01-JAN-2016 |
30-JUN-2016 |
Tamat (Perlu hantar laporan akhir) |
19. |
KAJIAN PELAN TINDAKAN KECEMASAN (ERP) EMPANGAN CHEREH, SUNGAI LEMBING, KUANTAN |
Member |
17-AUG-2015 |
31-DEC-2016 |
Tamat (Perlu hantar laporan akhir) |
20. |
Assessment of Pollution Dispersion from Gebeng Industrial Area |
Member |
01-APR-2015 |
31-MAR-2017 |
Selesai (Mencapai Sebahagian KPI) |
21. |
FLOOD SIMULATION FOR URBAN AREA |
Leader |
21-NOV-2014 |
20-NOV-2015 |
Tamat (Tutup Projek) |
22. |
Effect of Land Use Change on Recent Floods in Kuantan River Basin using Hydrological Model and Geoinformatics |
Member |
25-MAY-2014 |
24-OCT-2015 |
Selesai (Mencapai Sebahagian KPI) |
23. |
Structural Behaviour of Pretensioned Beams with Web Openings |
Member |
01-MAY-2010 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
24. |
Distribution Fitting For Extreme Wind Speed To Determine Design Wind Load for Civil Engineering Structure in Malaysia |
Leader |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |