NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
SUSTAINABLE TRANSPORT AND MOBILITY ORIENTED FOR URBAN DEVELOPMENT IN MALAYSIA |
Member |
01-MAY-2022 |
30-APR-2024 |
Tamat (Perlu hantar laporan akhir) |
2. |
KAJIAN LALULINTAS DAN PENGANGKUTAN AWAM BANDARAYA KUANTAN |
Member |
15-MAR-2022 |
14-MAR-2023 |
Tamat (Perlu hantar laporan akhir) |
3. |
DEVELOPMENT OF GYPSUM SOIL ADDITIVE FOR STABILIZATION OF PROBLEMATIC SOIL IN EAST COAST MALAYSIA |
Member |
25-MAY-2021 |
24-MAY-2023 |
Selesai (Mencapai Semua KPI) |
4. |
Formulation of Accessibility in Malaysian Housing based on Universal Design Concept |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Tidak Mencapai KPI) |
5. |
IBS BLOCKWORK FOR AFFORDABLE RESIDENTIAL BUILDING |
Member |
05-SEP-2018 |
04-NOV-2020 |
Tamat (Gagal Menghantar Laporan Akhir) |
6. |
Determination of Equilibrium Conditions at Trigger Level When Private Vehicles Equal to Public Transports Users |
Leader |
15-JUL-2014 |
14-JUL-2016 |
Tamat (Tutup Projek) |
7. |
Development of Teaching and Learning Module for Integration of Theory and Practical in Engineering Technology |
Member |
25-JUN-2014 |
24-JUN-2016 |
Selesai (Tidak Mencapai KPI) |
8. |
Program Perintis untuk Pengendali-Pengendali Lalulintas Bandar Kuantan dalam Penyediaan dan Pengeoperasian Sistem Pengankutan Mampan |
Leader |
15-JUL-2013 |
14-JUL-2015 |
Selesai (Mencapai Semua KPI) |
9. |
Modeling of the Association Between Road Environment Contributary Factors and Road Traffic Accidents for Federal Road 2 |
Member |
01-AUG-2010 |
31-JUL-2011 |
Tamat (Tutup Projek) |
10. |
Structural Behaviour of Pretensioned Beams with Web Openings |
Member |
01-MAY-2010 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
11. |
Derivation of A Sustainable Traffic Impact Assessment Practices Based on Green Technology Approaches |
Leader |
01-APR-2010 |
31-AUG-2012 |
Selesai (Mencapai Semua KPI) |
12. |
Derivation Of A Sustainable Traffic Impact Assessment Practices Based On Utility Maximation Theory |
Leader |
01-OCT-2009 |
31-OCT-2011 |
Tamat (Perlu hantar laporan akhir) |
13. |
Prioritization of Maintenance & Repairs Of Pavement |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
14. |
A study on the relationship between aggregate surface roughness and skidding incidents for proton cars.
|
Leader |
01-APR-2007 |
30-JUN-2008 |
Tamat (Tutup Projek) |
15. |
A study on the relationship between aggregate surface roughness and skidding incidents for proton cars.
|
Leader |
01-APR-2007 |
30-JUN-2008 |
Tamat (Tutup Projek) |
16. |
Prediction Model for Traffic Split at Junction for New Development |
Leader |
04-JAN-2007 |
30-JUN-2008 |
Selesai (Mencapai Semua KPI) |
17. |
A Study on The Effect of Roadside Development Towars Accident Rates |
Leader |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |
18. |
A Study on The Prediction Model For Traffic Split At Junction For New Development |
Leader |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |