NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
Investigation the Influence of Sediment Composition on Nutrient Dynamics, Algal Blooms, and Dissolved Oxygen in Lake Ecosystems |
Leader |
01-APR-2024 |
31-MAR-2026 |
Sedang Berjalan |
2. |
STUDY OF EFFECTIVENESS OF WATER SURGE RISK MEASUREMENT MODEL |
Member |
01-FEB-2024 |
08-FEB-2026 |
Sedang Berjalan |
3. |
FISHING LOCATION DETERMINATION SYSTEM (FSI) BY IOT-BASED BATHYMETRIC MEASUREMENT BY DRONE PLATFORM |
Member |
09-NOV-2023 |
08-NOV-2026 |
Sedang Berjalan |
4. |
BIFURCATION ANALYSIS OF A NEW LAKE EUTROPHICATION MODEL: BUILDING RESILIENCE TO CLIMATE CHANGE FOR LONGTERM SUSTAINABILITY IN TROPICAL LAKE MANAGEMENT |
Member |
15-SEP-2023 |
14-SEP-2025 |
Sedang Berjalan |
5. |
Formulation of physical and mechanical characteristics of asphalt mixtures incorporating tin tailing and iron |
Member |
15-AUG-2023 |
14-AUG-2025 |
Sedang Berjalan |
6. |
KAJIAN BAGI CADANGAN MENAIKTARAF INFRASTRUKTUR BAGI MENGURANGKAN BANJIR DI KELAT RENDANG, PEKAN |
Leader |
15-JUN-2022 |
14-JUN-2023 |
Selesai (Mencapai Semua KPI) |
7. |
KAJIAN SIMULASI BANJIR PROJEK CSR KG RELONG KE RAUB, PAHANG |
Leader |
15-JUN-2022 |
14-JUN-2023 |
Selesai (Mencapai Semua KPI) |
8. |
NEW MAHALANOBIS-TAGUCHI SYSTEM ENHANCEMENT MODEL USING ROBUST QUALITY INDEX FOR CLASSIFICATION SUSTAINMENT OF RAINFALL TRENDS |
Member |
01-JUN-2022 |
31-MAY-2024 |
Tamat (Laporan akhir dalam semakan) |
9. |
ELUCIDATION OF HYDRAULIC BEHAVIOR FOR FIBER-REINFORCED POROUS ASPHALT PAVEMENT |
Leader |
26-FEB-2021 |
25-FEB-2023 |
Selesai (Mencapai Semua KPI) |
10. |
Formulation of a mathematical model to predict alum sludge drying water retention behavior based on constitutive equations |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Tidak Mencapai KPI) |
11. |
KAJIAN STATUS HASILAN DAN KUALITI AIR NEGERI PAHANG DARUL MAKMUR |
Member |
01-JUL-2018 |
30-JUN-2019 |
Tamat (Perlu hantar laporan akhir) |
12. |
INVESTIGATION THE WATER QUALITY EFFECT DUE TO THE PRESENCE OF NUTRIENTS AND HEAVY METAL FROM SEDIMENTATION AND EROSION IN JEMBERAU RIVER TO TASIK CHINI |
Leader |
05-APR-2018 |
04-JUL-2020 |
Selesai (Tidak Mencapai KPI) |
13. |
DEVELOPMENT OF FLOOD DEPTH-DAMAGE CURVE MODEL FOR KUANTAN,PAHANG |
Member |
15-JUN-2017 |
14-JUN-2019 |
Selesai (Mencapai Semua KPI) |
14. |
Investigation Of The Sedimentation And Mining Activities In Tasik Chini Effect On The River Morphology Change |
Leader |
01-APR-2017 |
01-APR-2019 |
Selesai (Mencapai Sebahagian KPI) |
15. |
KAJIAN PENYEDIAAN PELAN PENGURUSAN LEMABANGAN SUNGAI BERSEPADU (IRBM), SUNGAI KUANTAN, PAHANG DI BAWAH PERLAKSANAAN JPS MALAYSIA |
Member |
14-FEB-2017 |
31-DEC-2018 |
Tamat (Tutup Projek) |
16. |
FLOOD MITIGATION MECHANISMS IN MINIMIZING FLOOD CALAMITIES�Flood Hazard Map (FHM) and early Flood Warning System (FWS) for Kuantan River Basin |
Member |
25-NOV-2015 |
24-NOV-2017 |
Tamat (Tutup Projek) |
17. |
Forecasting The Future Flow Characteristics Of Pahang River Basin With Climate Change Adaptation |
Member |
02-NOV-2015 |
01-NOV-2017 |
Selesai (Mencapai Semua KPI) |
18. |
Determining Potential Rainwater harvesting Sites using Satellite Images and Geographic Information System |
Member |
25-NOV-2014 |
24-NOV-2016 |
Selesai (Tidak Mencapai KPI) |
19. |
Evaluation of Flow Characteristics in Sewerage Systems |
Member |
01-FEB-2014 |
31-JAN-2016 |
Tamat (Tutup Projek) |
20. |
Slope Protection using New Natural Geotextile |
Member |
25-MAY-2013 |
24-MAY-2015 |
Tamat (Perlu hantar laporan akhir) |
21. |
A Study on Water Exchange Patterns Of Tasik Chini |
Member |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |
22. |
A Study On Sediment Distribution of Sungai Kuantan |
Leader |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |