NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
DEVELOPMENT OF LOW FLOW FREQUENCY CURVES FOR RIVERS IN PAHANG USING PROBABILITY DISTRIBUTION |
Member |
01-MAY-2022 |
30-APR-2024 |
Sedang Berjalan |
2. |
Role of socio-economic and property variables for flood hazard and vulnerability mapping at a data-scarce area |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Mencapai Semua KPI) |
3. |
ASSESSMENT OF REPRESENTATIVE CONCENTRATION PATHWAYS (RCPs) FOR MALAYSIA'S CLIMATE GENERATION |
Member |
25-SEP-2018 |
24-DEC-2020 |
Selesai (Mencapai Sebahagian KPI) |
4. |
KAJIAN PENYEDIAAN PELAN PENGURUSAN LEMABANGAN SUNGAI BERSEPADU (IRBM), SUNGAI KUANTAN, PAHANG DI BAWAH PERLAKSANAAN JPS MALAYSIA |
Member |
14-FEB-2017 |
31-DEC-2018 |
Tamat (Tutup Projek) |
5. |
FLOOD MITIGATION MECHANISMS IN MINIMIZING FLOOD CALAMITIES�Flood Hazard Map (FHM) and early Flood Warning System (FWS) for Kuantan River Basin |
Member |
25-NOV-2015 |
24-NOV-2017 |
Tamat (Tutup Projek) |
6. |
Forecasting The Future Flow Characteristics Of Pahang River Basin With Climate Change Adaptation |
Member |
02-NOV-2015 |
01-NOV-2017 |
Selesai (Mencapai Semua KPI) |
7. |
Evaluation of Flow Characteristics in Sewerage Systems |
Member |
01-FEB-2014 |
31-JAN-2016 |
Tamat (Tutup Projek) |
8. |
CH4 Degradation and Palm Oil Mill Effluent (POME) Treatment by Anaerobic Bacteria
|
Member |
01-DEC-2009 |
31-MAY-2011 |
Tamat (Tutup Projek) |
9. |
Anaerobic Conversion Of Biomass (POME Waste) For Hydrogen Production |
Member |
01-AUG-2009 |
31-JUL-2011 |
Selesai (Mencapai Semua KPI) |
10. |
Integrated Rainwater and Ground Water Harvesting Via WASRA for clean Water Supply in Rural Area |
Member |
08-JUL-2009 |
31-DEC-2009 |
Selesai (Mencapai Semua KPI) |
11. |
Development of Portable Submerged Membrane Bioreactor (MBR) for Sustainable Batik Effluent Treatment |
Member |
01-JUL-2009 |
30-JUN-2011 |
Tamat (Perlu hantar laporan akhir) |
12. |
Investigation on The Characteristic, Behavior and Treatment Option of Wastewater from Nitrite-Based Passivation Process for Industrial Chill Water System |
Member |
01-NOV-2008 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
13. |
Integrated Hybrid Coagulation-Direct Ultrafiltration For Production Of High Quality Drinking Water |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
14. |
Rain water Harvesting System for non- Portable Use at UMP Campus |
Leader |
09-JAN-2007 |
31-AUG-2008 |
Selesai (Mencapai Semua KPI) |
15. |
Cement Column Stabilization for Peat and Organic Soil |
Member |
09-JAN-2007 |
31-AUG-2008 |
Selesai (Mencapai Semua KPI) |
16. |
A Study on Water Exchange Patterns Of Tasik Chini |
Leader |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |
17. |
A Study On Sediment Distribution of Sungai Kuantan |
Member |
04-JAN-2007 |
31-MAR-2008 |
Selesai (Mencapai Semua KPI) |