NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
ENHANCEMENT OF SEWAGE TREATMENT SYSTEM VIA PHYTOREMEDIATION TECHNOLOGY (UIC220816) |
Member |
01-JUL-2022 |
30-JUN-2024 |
Sedang Berjalan |
2. |
ENHANCEMENT OF SEWAGE TREATMENT SYSTEM VIA PHYTOREMEDIATION TECHNOLOGY (RDU222405) |
Member |
01-JUL-2022 |
30-JUN-2024 |
Sedang Berjalan |
3. |
BEHAVIOUR AND STABILITY OF AEROBIC GRANULES UNDER DIFFERENT OPERATIONAL STRATEGIES OF SBR AND ORGANIC LOADING RATE OF WASTEWATER |
Member |
01-MAY-2022 |
30-APR-2024 |
Sedang Berjalan |
4. |
THE APPLICATION OF GREEN ROOF WITH RECYCLED WASTE MATERIALS TO ENHANCE URBAN STORMWATER QUANTITY AND QUALITY |
Member |
25-APR-2021 |
24-APR-2023 |
Tamat (Perlu hantar laporan akhir) |
5. |
DEVELOOMENT OF CAPRA HIRCUS FEED BY THE UTILIZATION OF SOLID WASTE AND PALM OIL ACID (POA) FROM PALM OIL MILL EFFLUENT (POME) |
Leader |
15-OCT-2019 |
14-OCT-2021 |
Tamat (Perlu hantar laporan akhir) |
6. |
Elucidate the role and mechanisms of micro and nano- scale conductive particles in enhancing the efficiency of anaerobic digestion |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Mencapai Semua KPI) |
7. |
A STUDY OF THE POTENTIAL OF SELECTED MACROPHYTES SPECIES TOWARDS NUTRIENT REMOVAL OF MAN-MADE LAKE BY PHYTOREMEDIATION PROCESS. |
Leader |
01-JUL-2019 |
30-SEP-2021 |
Tamat (Perlu hantar laporan akhir) |
8. |
INVESTIGATION OF ELECTROTROPHS IN MICROBIAL FUEL CELL |
Member |
25-APR-2019 |
24-JUL-2021 |
Selesai (Mencapai Semua KPI) |
9. |
THE POTENTIAL OF SUBMERGED PLANT SPECIES PASTIOA STRATIOTES SP. AND EICHHORNIA CRASSIPES TOWARDS NUTRIENT REMOVAL OF MAN-MADE LAKE BY PHYTOREMEDIATION |
Leader |
15-MAR-2019 |
14-MAR-2021 |
Tamat (Perlu hantar laporan akhir) |
10. |
DEVELOPING THE DESIGN OF ERGO-SUNNATIC LAVATORY BASED ON PROPHETIC TRADITION (SUNNAH-COMPLIANT DESIGN) |
Member |
20-SEP-2017 |
19-SEP-2019 |
Tamat (Perlu hantar laporan akhir) |
11. |
Hibiscus Cannabinus L. (Kenaf) fibers filter to reduce the air pollutants |
Member |
20-SEP-2017 |
19-SEP-2019 |
Tamat (Tutup Projek) |
12. |
PENENTUSAHAN PERISTIWA SERANGAN KOMUNIS DI BALAI POLIS KUALA KERAU, TEMERLOH PAHANG DARUL MAKMUR |
Member |
15-JUN-2017 |
14-JUN-2019 |
Selesai (Tidak Mencapai KPI) |
13. |
KAJIAN PENYEDIAAN PELAN PENGURUSAN LEMABANGAN SUNGAI BERSEPADU (IRBM), SUNGAI KUANTAN, PAHANG DI BAWAH PERLAKSANAAN JPS MALAYSIA |
Member |
14-FEB-2017 |
31-DEC-2018 |
Tamat (Tutup Projek) |
14. |
A COMMERCIALISED DO IT YOURSELF (DIY) PEST REPELLANT CALLED PESTKILLA AS A GREEN TECHNOLOGY PRODUCT |
Leader |
15-DEC-2016 |
14-DEC-2017 |
Selesai (Mencapai Semua KPI) |
15. |
Pisoptera |
Leader |
03-SEP-2014 |
02-SEP-2015 |
Selesai (Mencapai Semua KPI) |
16. |
Transfer of Integrated Groundwater and Rainwater Harvesting Via Wasra tm UMP System As Alternative Water Supply |
Leader |
01-SEP-2014 |
31-AUG-2016 |
Tamat (Perlu hantar laporan akhir) |
17. |
Development of Domestic Wastewater Treatment Facility Using Integrated Bioremediation and Phytoremedition Technology for Refurbishment of Oxidation Pond Process via Phytogreen UMP |
Leader |
01-AUG-2012 |
31-JUL-2014 |
Selesai (Mencapai Semua KPI) |
18. |
Development of Domestic Wastewater Treatment Facility Using Integrated Bioremediation and Phytoremedition Technology for Refurbishment of Oxidation Pond Process via Phytogreen UMP |
Member |
01-AUG-2012 |
31-JUL-2014 |
Selesai (Mencapai Semua KPI) |
19. |
THE POTENTIAL OF PISOPTERA PRODUCT TO PENETRATE MARKET IN PENINSULAR AND EAST MALAYSIA |
Leader |
22-DEC-2011 |
21-DEC-2012 |
Selesai (Mencapai Semua KPI) |
20. |
A Study of Physical and Water Quality of Lakes at UMP |
Member |
01-OCT-2011 |
30-MAR-2012 |
Tamat (Tutup Projek) |
21. |
Biosorption of Cadmium from Water Using Processed Moringa Oleifera Tee Leaves |
Member |
01-OCT-2011 |
31-DEC-2013 |
Selesai (Mencapai Semua KPI) |
22. |
Fundamental Study on Kinetic of Water Sorption and Thermodynamics Properties of Bacterial Cellulose/Starch Biocomposite |
Member |
01-FEB-2011 |
31-JAN-2013 |
Selesai (Mencapai Semua KPI) |
23. |
CH4 Degradation and Palm Oil Mill Effluent (POME) Treatment by Anaerobic Bacteria
|
Member |
01-DEC-2009 |
31-MAY-2011 |
Tamat (Tutup Projek) |
24. |
CH4 Degradation and Palm Oil Mill Effluent (POME) Treatment by Anaerobic Bacteria
|
Member |
01-DEC-2009 |
31-MAY-2011 |
Tamat (Tutup Projek) |
25. |
Anaerobic Conversion Of Biomass (POME Waste) For Hydrogen Production |
Member |
01-AUG-2009 |
31-JUL-2011 |
Selesai (Mencapai Semua KPI) |
26. |
Integrated Rainwater and Ground Water Harvesting Via WASRA for clean Water Supply in Rural Area |
Leader |
08-JUL-2009 |
31-DEC-2009 |
Selesai (Mencapai Semua KPI) |
27. |
LESTARI: Utilizing natural driven process for industrial wastewater treatment toward an environmental-friendly sustainable development |
Leader |
08-JUL-2009 |
07-JUL-2010 |
Selesai (Mencapai Semua KPI) |
28. |
Development of Sustainable Alternative Fuel From Renewable Source of Water Using Green Technology |
Member |
01-JUL-2009 |
30-JUN-2011 |
Tamat (Perlu hantar laporan akhir) |
29. |
Development of Portable Submerged Membrane Bioreactor (MBR) for Sustainable Batik Effluent Treatment |
Member |
01-JUL-2009 |
30-JUN-2011 |
Tamat (Perlu hantar laporan akhir) |
30. |
Waste To Wealth: Oil Palm Mesocrap (OPM) and Empty Fruit Bunch (EFB) Mixture As A Raw Material Of Artificial Bait To Control Subteranean Termites |
Leader |
01-MAY-2009 |
31-DEC-2010 |
Selesai (Mencapai Semua KPI) |
31. |
The Utility Of Drip Irrigation For The Distribution Of Domestic And Aquaculture Effluent For Landscape Plants |
Member |
01-MAY-2009 |
31-DEC-2010 |
Selesai (Mencapai Semua KPI) |
32. |
A Novel Method Of Fully Continuous Ultrasonic Assisted Hollow Fiber Membrane Spinning Process |
Member |
01-MAY-2009 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
33. |
Investigation on The Characteristic, Behavior and Treatment Option of Wastewater from Nitrite-Based Passivation Process for Industrial Chill Water System |
Member |
01-NOV-2008 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
34. |
The Study on Water Quality Reservoir and Water Management in UMP for Water Supply and Reuse Programe |
Member |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |
35. |
Investigation on the Effectiveness of Phytoremediation (Rhizofiltration) Process to Improve BOD, COD, pH and Other Indicating Parameter in Industrial Wastewater |
Leader |
01-OCT-2007 |
31-DEC-2010 |
Tamat (Tutup Projek) |