NO. |
TITLE |
ROLE |
START DATE |
END DATE |
STATUS |
1. |
ENHANCEMENT OF SEWAGE TREATMENT PLANT SYSTEM VIA INTEGRATED CONSTRUCTED
TREATMENT SYSTEM USING PYTOREMEDIATION TECHNOLOGY |
Leader |
15-JUL-2023 |
14-JUN-2026 |
Sedang Berjalan |
2. |
IMMOBILISED BIOSORBENT OF RED SEAWEED FOR HEAVY METAL REMOVAL |
Member |
01-OCT-2022 |
30-SEP-2024 |
Sedang Berjalan |
3. |
ENHANCEMENT OF SEWAGE TREATMENT SYSTEM VIA PHYTOREMEDIATION TECHNOLOGY (RDU222405) |
Leader |
01-JUL-2022 |
30-JUN-2024 |
Sedang Berjalan |
4. |
ENHANCEMENT OF SEWAGE TREATMENT SYSTEM VIA PHYTOREMEDIATION TECHNOLOGY (UIC220816) |
Leader |
01-JUL-2022 |
30-JUN-2024 |
Sedang Berjalan |
5. |
BEHAVIOUR AND STABILITY OF AEROBIC GRANULES UNDER DIFFERENT OPERATIONAL STRATEGIES OF SBR AND ORGANIC LOADING RATE OF WASTEWATER |
Leader |
01-MAY-2022 |
30-APR-2024 |
Sedang Berjalan |
6. |
THE APPLICATION OF GREEN ROOF WITH RECYCLED WASTE MATERIALS TO ENHANCE URBAN STORMWATER QUANTITY AND QUALITY |
Member |
25-APR-2021 |
24-APR-2023 |
Tamat (Perlu hantar laporan akhir) |
7. |
Role of socio-economic and property variables for flood hazard and vulnerability mapping at a data-scarce area |
Member |
01-SEP-2019 |
31-MAY-2022 |
Selesai (Mencapai Semua KPI) |
8. |
A STUDY OF THE POTENTIAL OF SELECTED MACROPHYTES SPECIES TOWARDS NUTRIENT REMOVAL OF MAN-MADE LAKE BY PHYTOREMEDIATION PROCESS. |
Member |
01-JUL-2019 |
30-SEP-2021 |
Tamat (Perlu hantar laporan akhir) |
9. |
INVESTIGATION OF ELECTROTROPHS IN MICROBIAL FUEL CELL |
Member |
25-APR-2019 |
24-JUL-2021 |
Selesai (Mencapai Semua KPI) |
10. |
Hibiscus Cannabinus L. (Kenaf) fibers filter to reduce the air pollutants |
Leader |
20-SEP-2017 |
19-SEP-2019 |
Tamat (Tutup Projek) |
11. |
DEVELOPMENT OF FLOOD DEPTH-DAMAGE CURVE MODEL FOR KUANTAN,PAHANG |
Member |
15-JUN-2017 |
14-JUN-2019 |
Selesai (Mencapai Semua KPI) |
12. |
A COMMERCIALISED DO IT YOURSELF (DIY) PEST REPELLANT CALLED PESTKILLA AS A GREEN TECHNOLOGY PRODUCT |
Member |
15-DEC-2016 |
14-DEC-2017 |
Selesai (Mencapai Semua KPI) |
13. |
Pisoptera |
Member |
03-SEP-2014 |
02-SEP-2015 |
Selesai (Mencapai Semua KPI) |
14. |
Transfer of Integrated Groundwater and Rainwater Harvesting Via Wasra tm UMP System As Alternative Water Supply |
Member |
01-SEP-2014 |
31-AUG-2016 |
Tamat (Perlu hantar laporan akhir) |
15. |
Development of Domestic Wastewater Treatment Facility Using Integrated Bioremediation and Phytoremedition Technology for Refurbishment of Oxidation Pond Process via Phytogreen UMP |
Member |
01-AUG-2012 |
31-JUL-2014 |
Selesai (Mencapai Semua KPI) |
16. |
Improving Wastewater Quality by Using Limestone-Filled Tank Treatment |
Member |
01-MAY-2010 |
01-FEB-2012 |
Tamat (Perlu hantar laporan akhir) |
17. |
"Biofilter As Post-Treatment For Sewage Treatment Plant(STP)" |
Member |
01-JAN-2010 |
31-DEC-2011 |
Tamat (Tutup Projek) |
18. |
LESTARI: Utilizing natural driven process for industrial wastewater treatment toward an environmental-friendly sustainable development |
Member |
08-JUL-2009 |
07-JUL-2010 |
Selesai (Mencapai Semua KPI) |
19. |
Integrated Rainwater and Ground Water Harvesting Via WASRA for clean Water Supply in Rural Area |
Member |
08-JUL-2009 |
31-DEC-2009 |
Selesai (Mencapai Semua KPI) |
20. |
Waste To Wealth: Oil Palm Mesocrap (OPM) and Empty Fruit Bunch (EFB) Mixture As A Raw Material Of Artificial Bait To Control Subteranean Termites |
Member |
01-MAY-2009 |
31-DEC-2010 |
Selesai (Mencapai Semua KPI) |
21. |
The Utility Of Drip Irrigation For The Distribution Of Domestic And Aquaculture Effluent For Landscape Plants |
Leader |
01-MAY-2009 |
31-DEC-2010 |
Selesai (Mencapai Semua KPI) |
22. |
Investigation on The Characteristic, Behavior and Treatment Option of Wastewater from Nitrite-Based Passivation Process for Industrial Chill Water System |
Leader |
01-NOV-2008 |
30-APR-2011 |
Tamat (Perlu hantar laporan akhir) |
23. |
The Study on Water Quality Reservoir and Water Management in UMP for Water Supply and Reuse Programe |
Leader |
01-AUG-2008 |
31-JUL-2009 |
Selesai (Mencapai Semua KPI) |